GENERAL PROJECT OVERVIEW Clause Samples

GENERAL PROJECT OVERVIEW. 1.01 For questions regarding this document, contact the Ethernet Support Center at ▇▇▇-▇▇▇-▇▇▇▇, option 2. 1.02 AT&T shall furnish and install materials associated with CCU-1609270664 MDU Project - The Reef Club - North Miami Beach FL, at ▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇ ▇▇▇▇▇, providing a certified design and installation. This installation will be per the floor plans and discussions with ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ (305-491-7981) and as further described below.
GENERAL PROJECT OVERVIEW. Project Description ------------------- Progressive intends to develop a state-of-the-art Data/Information Systems Center in suburban Mayf▇▇▇▇ ▇▇▇lage, Ohio. The project will be master planned to accommodate growth. The Phase I project is designed to house the data center for Progressive's primary computer and processing equipment. The Phase I building will be approximately 80,000 square feet comprised of the following space: 37,600 sf Data Processing Area 25,000 sf Mechanical Room/Utility & Support Area 2,400 sf Loading 11,550 sf Office/Support Area 3,450 sf Core Area ------- 80,000 sf Total Area * * A generator building of approximately 6,000 -square-feet will be provided The design criteria for the mechanical and electrical systems will be as follows: - Uninterruptible Power Supply = 2N+2 - Generators = 2N - Chilled Water Plant = 2N - Make-up Water = 2N - Fire Protection = N - Electrical Distribution = 2N - Chilled Water Distribution = 1.5N - Other = N The above design criteria is based on the final system configuration with all future equipment installed.

Related to GENERAL PROJECT OVERVIEW

  • Project Overview With ever growing size of cities, ensuring high levels of physical security without significantly increasing the number of security personnel or budget seems to be a daunting task. A heightened sense of security and ever increasing challenges require new tactics with more access to integrated system and centralized information. This necessitates the need of designing and implementing Command and Control centers for critical infrastructure across different cities. A command and control center (CCC) in City Surveillance and Incident Response Project refers to a secure building in a government that operates as the surveillance monitoring center, coordination office and alarm monitoring center all in one. The CCC includes Video Surveillance room, Dial 100 Control room, Forensic Investigation Room, ITMS room and Data center & FMS/NOC Room. The CCC is the “nerve center” - a central administrative location from where overall assets and activities are monitored and managed. The command and control centers would be operated by State Police department. City Surveillance system would involve installation of high definition fixed and PTZ IP cameras, capable of providing optical zoom, to obtain quality video stream day in and day out for the Command & Control Center. A diversified IP based network infrastructure backbone would be deployed involving high speed fibre optics/ wireless technologies to carry video from cameras to the command and control center. The CCC would be equipped with huge video walls, workstations, video management servers and video data storage clusters of several hundred terabytes. The Command and Control Center would integrate with various security systems and sensors and enable the operators to carry out the coordinated response plans effectively. The Command & Control solution would allow the Video Surveillance Room operator/ Dial 100 operator to monitor the cameras, collect inputs, dissect information and make actionable recommendations. The system would provide configurable rules Collaborative Change Management monitoring-Feeds from various public and Capacity Building places where systems which include are already installed training of police like malls, personnel on various community centers, software's like airport and railway VMS,CCC,Dial station etc. 100,Forensic etc. Edge Equipments Network Connectivity (Cameras, Sensors, (Optical Fibre, Radio Panic Button, ITMS Communication, PRI etc.) Line, Switch etc.) with tailored alerts, dashboard visualizations, intelligent role based work flow, response tools and situation collaboration. Surveillance and Incident response project This RFP intends to select System Integrator’s who will be responsible for supply, installation, commissioning of procured items under this rate contract and FMS of Edge Equipments/items procured under this rate contract, existing items available in Abhay Command Center in 26 districts and items to be procured till project completion for this project in different cities of Rajasthan. Rate Contract for Supply, Installation, commissioning and FMS of Edge equipment’s under Surveillance and Incident Response Project in the State of Rajasthan (After Pre-bid)

  • Agreement Overview This SLA operates in conjunction with, and does not supersede or replace any part of, the Agreement. It outlines the information technology service levels that we will provide to you to ensure the availability of the application services that you have requested us to provide. All other support services are documented in the Support Call Process.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Project Implementation The Borrower shall:

  • Access to Project Site ‌ City will make available, no later than the commencement date designated in the current construction Schedule accepted by City, the lands and facilities upon which the Work is to be performed, including such access and other lands and facilities designated in the Contract Documents, for use by Contractor.