General Question. The plans indicate that KUB will be providing the 15-kV cable (to be installed by the electrical sub). Please clarify if KUB will be providing all terminations and rubber goods for this cabling.
General Question. Will KUB be installing the poles and associated 15kw devices as shown in Appendix C? RESPONSE: No. KUB will install only portions of the Appendix C Construction Guide Details. KUB will install all poles and overhead line hardware connection components required to connect to the Contractor’s prepared UG cable installation. For each riser, the Contractor will furnish and install all concrete-encased duct to each pole, all protective concrete conduit riser pedestals (2’ minimum height), and the conduit risers. All conduit risers must have protective concrete pedestals. For each riser, the Contractor will also install KUB-furnished UG cable, cable grips, cable terminators, cable compression terminal connectors, cable bracket terminals and cable tags, as well as all necessary conduit riser standoffs. Once the Contractor’s installation has been installed and approved by KUB, KUB will terminate the UG cables to our overhead line hardware/busses including the UG cable concentric neutral wires (please consult KUB for appropriate lengths).
General Question. It is our understanding that the electrical contractor will be procuring the Generator/Switchgear package, as well as the panelboards, 75kva transformers, disconnects and starters. All other medium voltage equipment and cable will be procured by KUB. Is this understanding correct?
General Question. 1. Is there a list of WMATA furnished property for this contract?
2. Is it the intent to provide armored car service as part of the contract from Notice to Proceed, it is listed as optional?
3. Is there a schedule/requirement for security personnel?
4. How many officers are required at the facility and how many collection teams do you have every day?
General Question. What aid to construction fees will KUB require? This pertains to work electrical subcontractors may have done in areas with other utility companies where the utility requires fees for setting poles, running service to a jobsite, etc.
General Question. Do you have weights of the equipment provided by KUB that have to be transported to the site and installed by the electrical contractor? • Pad-mounted VFI switchgear unit = 1,500 lb. • 750 MCM UG Cable Reel = 6,000 lb. • 4/0 MCM UG Cable Reel = 3,000 lb. • Pad-mounted transformer = 5,000 lb.
General Question. Does KUB have preferred fire suppression system subcontractors? Access system and CCTV subcontractor?
General Question. Do these interpretations apply to the provisions of agreements that have been entered into subsequent to February 7, 1965? Answer: No.
General Question. You can submit General Questions at Support Desk or send an email to ▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇. All requests received directly to any Koongo email address will be considered as General Question.
General Question. Client end‑user has a general question to which the timeliness of the answer in no way impacts the end‑user’s ability to respond to business requirements or customer inquiries. Examples of General Questions might include: • Miscellaneous inquiries CLIENT END-USER SHALL HAVE THE RIGHT TO CHANGE THE PRIORITY LEVEL FOR ANY INCIDENT AT ANY TIME.