Please clarify Clause Samples

Please clarify. At the end of the first complete (three-month)full Quarter, and at the end of each Quarter thereafter during the Term, the parties shall evaluate the level of effort (amount of labor provided by District) required to provide Services, and adjust the FTEfull-time employee (FTE) equivalent percentages up or down accordingly for the next Quarter for current charges and projected charges 1 FTE vs .5 FTE with Chief Plant Operator (CPO) and with LRO. These figures will be updated after every billing cycle to make sure all costs are correct. If the Parties are unable to agree on any proposed quarterly adjustment, the Parties shall address any such dispute in accordance with the Dispute Resolution provision of this Agreement.
Please clarify. For Gasket : 1 set means 2 nos.of each size & For Studs : 1 set means all the nuts & studs required for 1 no. flange joint of each size. All type of IO barrier/ relay/ terminal as applicable (excess of 20% or 01 no.). Rest Tender Condition prevails. 111 TECHNICAL SPECIFICATION FOR TURBINE METER SPEC. No. : MEC / 05 / E5/ TS / TFM-030 Clause 9 Straightening vanes shall be provided to eliminate swirls and cross current setup by the pipe-fittings, valves or regulators preceding the meter inlet piping. Straightening vanes shall be designed according to latest revision of AGA Report No-3. Straightening vanes shall be tube bundle of 316 SS tubes and shall be designed and approved by the meter manufacturer. we understood that for Turbine meters with inbuilt straightners, mentioned clause in not applicable. Tender Condition Prevails. 112 ELECTRIC PROCESS HEATER and CONTROL PANEL MEC/DS/05/E9/040A 4) Floor‐mounted with suitable supports, mounting arrangement We understood Installation of electric heater is floor mounted & Not on skid and shall be supplied seperately. Hnece required Civil scope of work shall be in customer scope. Electrical Heater Control panel shall be Floor mounted, however Electric Heater shall be skid mounted. ▇▇▇ ▇&▇▇ ▇&▇▇ mentioned 3/4" Root valves for Instrument Tappings. Kinldy accpet 1/2" conncetions for instument and sensing lines. Tender Condition Prevails.
Please clarify before the start of the hour.
Please clarify. Answer No 4 The Contracting Authority will publish the Corrigendum regarding the Draft Contract document. Question No 5: ▇▇▇▇▇ ▇▇. Terms of Reference, Page 22 of 30, Indicative number of working days Please clarify if the indicative number of working days refers only to the fee-based component. Answer No 5 Indicative number of days refers to the fee-based and lump sum component. The ToR states quote: ”The inputs presented in the table above only indicative, provided for information only and:  The inputs for the activities included in the lump-sums (Section 6.6 below) are included.  Reallocation of the inputs among the key- experts is possible (subject to the proposal of the tenderer and acceptance of the Contracting Authority)” end of quote. Question No 6: ▇▇▇▇▇ ▇▇. Terms of Reference, Page 22 of 30, Office accommodation Please clarify which type of accommodation will be provided by the Contractor in the site-office. Is furniture included? Please clarify if communications are included in the Contractor’s cost as mentioned. Answer No 6 Site-office will be fully equipped and communication costs will be included in the Contractor’s costs. Question No 7: ▇▇▇▇▇ ▇▇. Terms of Reference, Page 23 of 30, Incidental Expenditures Please clarify what type of visibility actions are included. ToR does not detail any type of event in Supervision activities. Which are the purposes of those events? Who are the target groups? How many? How must be considered in the work programme? Answer No 7 Please, refer to the “Communicating CEF projects” at ▇▇▇▇▇://▇▇.▇▇▇▇▇▇.▇▇/inea/sites/default/files/co mm_cef_leaflet_20180712.pdf Question No 8: ▇▇▇▇▇ ▇▇. Terms of Reference, Page 23 of 30, Incidental Expenditures Answer No 8 All incidentals need prior Authorization. Please clarify if any of the incidentals should need prior Authorization as it is mentioned that “performance of quality checks (tests) that can be performed by the Supervision Contractor based in the agreement with the Contracting Authority” Question No 9: ▇▇▇▇▇ ▇▇. Terms of Reference, Page 15 of 30, Stakeholders Engagement Which type of stakeholders? How they will be engaged and paid? Answer No 9 The Project is implemented in compliance with and subjected to the EIB`s Environmental and Social Standards. These require a systematic approach to stakeholder engagement that the Project is expected to build and maintain by way of a constructive relationship with relevant stakeholders. Stakeholder engagement is an inclusive an...
Please clarify. Web Security [firewall protection, antivirus application, anti- spywares]will be provided by CPCB/NIC. 91 Page 61; Section 6: Clause 2.12 Training and Institutional Development Consultant shall train Plan for institutional sustainability Kindly clarify the following: 1. No. of People to be trained? 2. How many days training? CPCB recommends training for 10 Resources for 15 days timeframe.
Please clarify.  the extent and scope of the "renovation, development and expansion of the Passenger Terminal, Associated Facilities and Airside Facilities"; and  the extent and scope of information technology and other equipment required under Section 2.1.7. For instance, please clarify if the Concessionaire will be responsible for procuring and/or financing security systems and equipment (e.g. x-ray machines, etc.). This comment has been noted and considered by the Grantors. To the extent to which the comment has been accepted, an amendment has been made to the Concession Agreement and is reflected in the Generic and Panglao versions of the Concession Agreement issued on 15 December 2015.
Please clarify. Answer No 15 The geotextile shall be placed under rip-rap toe of the bank and along sloped areas of the bank. Question No. 16 Could you please provide us the technical specifications and drawings for Items 8.3.1, 9.3.1 from BoQ, (bollards, ladders, protective verge). Answer No 16 Equipment of the quay such as bollards, ladders and protective verge are not elaborated in graphic form within Design for construction permit. Those details shall be part of the Design for execution of the works Question No. 17 Vol_4 BoQ, External hydrotechnical installations, item 3.2 Sewerage / 3.2. Installation / 4 .9 Supply, transport, and installation of manhole chamber Ø1000 made of high-density polyethylene. Since the height of the manhole chamber and the diameter of the inlet and outlet pipes are not specified, please provide technical specifications, dimensions, and drawings for the manhole chamber. Answer No 17 Details shall be part of the Design for execution of the works. Question No. 18 Please, provide us with technical specifications with grain size distribution curves for materials according to column “Item from BoQ” from the table below: Answer No 18 The grain size distribution curves for material specified within items: 8.1.4, 9.1.3, 8.1.5, 9.1.4, 30.5.2 shall be defined within Design for execution of the works depending of the chosen borrow area and available material. The properties required by Tender documents (Design for construction permit) are specified through Ms=25MPa and Ms=35MPa and description is given on drawings. Question No. 19 According to BoQ, items 8.2.3 and 9.2.3 steel casing thickness of pipes for piles is 10mm. According to Design for building permit, document “2.1.1 PROJEKAT KEJSKE KONSTRUKCIJE” page 20/45 steel casing thickness of pipes for piles is 12mm. Please clarify. Answer No 19 The thickness of the steel pipe shall be 12mm. Question No 20 Document: Vol_1_S1_d4b_itt_en_BOGWKS_20220721, page 9/14, list of plant for execution of contract, plant No 19 from table below: This description of the plant could have the meaning of several different types of excavator – dredger which has a similar use. Does this description assume a bucket dredger (“bager vedricar”)? Whether this description can be understood and accepted as well as a crawler excavator with grab and boom min 35 m, min weight 70 t? Answer No 20 Hydraulic dredger(s) with associated transportation logistics which enables backfilling capacity of 800m3 (of solid mass) per day: • Cutting...
Please clarify the Secondary Education Contribution, the Childcare Services Contribution, the Library Services Contribution, and the Youth Services Contribution, shall each be index-linked to increases in the PUBSEC Index by the application of the formula A = B x (C ÷ D) where: A = is the total amount to be paid; B = is the principal sum stated in this Agreement; C = is the PUBSEC Index for the date upon which interim payment is actually due; D = is the figure of 175; and C÷D= is equal to or greater than 1

Related to Please clarify

  • Optional Xactimate Response Attachment (Part 2)

  • Review Protocol A narrative description of how the Claims Review was conducted and what was evaluated.

  • New Jobs Any new job or jobs created by technological or mechanization changes shall be offered to present employees capable of being trained to perform the new or changed job and the Employer will provide such training. During training, the employee will maintain his/her rate. It is understood that the training herein referred to is on the job and not to exceed sixty (60) days. Certain specialized technical jobs may require additional and off-site training. An employee whose job is eliminated, if any, and who cannot be placed in a job of equal grade shall receive saved grade until such time as that employee fails to bid or apply for a position in the employee’s former wage level. The obligation hereinabove set forth shall not be construed to, in any way, abridge the right of the Employer to make such changes.

  • Contents of Personnel File A. Adverse statements prepared by the County shall not be included in an employee's official personnel file unless a copy is provided to the employee. B. An employee shall have the right to inspect and review the contents of his or her official personnel file at reasonable intervals. C. In addition, an employee shall have the right to inspect and review the contents of his or her official personnel file in any case where the employee has a grievance related to performance; to a performance evaluation; or is contesting his or her suspension or discharge from County service. D. Letters of reference and reports concerning criminal investigations concerning the employee shall be excluded from the provisions of B. and C., above. E. An employee shall have the right to respond in writing or personal interview to any information contained in his or her official personnel file, such reply to become a permanent part of such employee's official personnel file. F. Any contents of an employee's official personnel file may be destroyed pursuant to an agreement between the Chief of Employee Relations and the employee concerned or by an order of an arbitrator, court or impartial hearing officer unless the particular item is otherwise required by law to be kept.

  • Signaling protocol 4.1.3.1 SS7 Signaling is AT&T-21STATE’s preferred method for signaling. Where MF signaling is currently used, the Parties agree to use their best efforts to convert to SS7. If SS7 services are provided by AT&T-21STATE, they will be provided in accordance with the provisions of the applicable access tariffs. 4.1.3.2 Where MF signaling is currently used, the Parties agree to interconnect their networks using MF or dual tone MF (DTMF) signaling, subject to availability at the End Office Switch or Tandem Switch at which Interconnection occurs. The Parties acknowledge that the use of MF signaling may not be optimal. AT&T-21STATE will not be responsible for correcting any undesirable characteristics, service problems or performance problems that are associated with MF/SS7 inter-working or the signaling protocol required for Interconnection with CLEC employing MF signaling.