Generate Sampling Weights Sample Clauses

Generate Sampling Weights. The contractor shall develop sampling weights necessary to produce estimates required for summaries and analyses as specified in the NAEP Design Plan prepared by the DAR contractor. • The student sampling weights shall be developed using procedures similar to those used in the prior NAEP assessments and described in the NAEP Technical Documentation. • The contractor shall provide both preliminary and final student and teacher sampling weights for operational assessments to the DAR contractor. • The contractor shall negotiate a schedule for the preparation of preliminary and final sampling weights with the DAR contractor. • The contractor shall maintain, for NCES inspection, the records and results of the statistical quality control checks used in creating all sampling weights and the data files which contain them. • The results of the sampling weights quality control checks for each operational assessment will be presented to NCES following the delivery of the final sampling weights to the DAR contractor. • The contractor shall provide student and teacher sampling weights to the DAR contractor on a schedule that allows the initial reports of mathematics and reading results in grades 4 and 8 to be released within 6 months of the end of data collection (unless otherwise directed by NCES). • Sampling weights for grade 12 students and teachers and all students and teachers in national assessments of other subject areas shall be transmitted on a schedule that allows the initial reports of results to be released within 12 months of the end of data collection. • According to NCES Statistical Standards, the contractor shall conduct a non-response bias analysis at any stage of a data collection with a unit response rate less than 85%. If the unweighted student response rate falls below 85%, the contractor shall conduct non-response bias analyses to determine whether or not the data are missing at random. Additionally, if the item response rate is below 85% for any NAEP questionnaire item, a nonresponse bias analysis is also required for each of those items (note: this nonresponse bias analysis does not apply to individual cognitive test items). The contractor shall develop a non-response bias analysis report for NCES approval following the format used for the 2013 and 2015 assessments. • The SDC contractor shall provide the DAR contractor with the data necessary to simplify the variance estimation process for primary and secondary NAEP student-centric and teacher- ...

Related to Generate Sampling Weights

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Weights light, moderate and heavy, have their normal everyday meanings, and are to be applied consistently, regardless of the physical characteristics of the jobholder and whether the duties are normally carried out by women or by men; or by small people or large people; or by fit or unfit people. So, a sack of cement or a sack of potatoes is a heavy weight, even if it is lifted and carried without obvious exertion by a tall, fit, young person.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..