Geotechnical works Clause Samples

The 'Geotechnical works' clause defines the responsibilities and requirements related to site investigation, soil testing, and ground preparation activities necessary for a construction project. It typically outlines the scope of geotechnical surveys, the standards to be followed, and the obligations for reporting and addressing any subsurface issues discovered during the works. By clearly allocating duties and expectations regarding ground conditions, this clause helps prevent disputes over unforeseen site problems and ensures that construction proceeds on a stable and well-understood foundation.
Geotechnical works. To inspect, keep and maintain in good and substantial repair and condition and carry out all necessary works in respect of the Slope Structures in compliance with the conditions of the Land Grant and in accordance with the Geotechnical Guidelines, the Slope Maintenance Manuals and all guidelines issued from time to time by the appropriate Government departments regarding the maintenance of the Slope Structures and to employ suitably qualified personnel for that purpose.

Related to Geotechnical works

  • Geotechnical Engineer « »« » « » « » « » « »

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Laboratory a. Drug tests shall be conducted by laboratories licensed and approved by SAMSHA which comply with the American Occupational Medical Association (AOMA) ethical standards. Upon advance notice, the parties retain the right to inspect the laboratory to determine conformity with the standards described in this policy. The laboratory will only test for drugs identified in this policy. The City shall bear the cost of all required testing unless otherwise specified herein. b. Tests for all controlled substances, except alcohol, shall be by oral fluid testing and shall consist of two procedures, a screen test and, if that is positive, a confirmation test. c. To be considered positive for reporting by the laboratory to the City, both samples must be tested separately in separate batches and must also show positive results on the confirmatory test. d. In the event of a positive test, the testing laboratory will perform an automatic confirmation test on the original specimen at no cost to the Covered Employee. In addition, the testing laboratory shall preserve a sufficient specimen to permit an independent re-testing at the Covered Employee’s request and expense. The same, or any other, approved laboratory may conduct re-tests. The laboratory shall endeavor to notify the designated MRO of positive drug, alcohol, or adulterant tests results within five (5) working days after receipt of the specimen.