Gridding Sample Clauses

The Gridding clause establishes a method for organizing or segmenting data, resources, or physical spaces into a structured grid format. In practice, this might involve dividing a large area into smaller, equally sized sections for purposes such as mapping, resource allocation, or scheduling. By implementing a grid system, the clause ensures systematic management and easy reference, thereby enhancing efficiency and reducing confusion in operations that require precise organization.
Gridding. The corrected geophysical data from each survey line will be interpolated between survey lines using a random gridding method to yield x-y grid values for an expected standard grid cell size of 0.25 cm at the mapping scale.
Gridding. (also known as “Excavation Notification Area”) means the geographic boundary area identified by Customer and provided to the applicable state One-Call center which is used to determine whether a request for Locate will generate a ticket for Customer after receipt of an Excavator’s notification of intent to excavate (i.e., receipt of a locate ticket).

Related to Gridding

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Logging The ISP will require the maintenance of network and application logs as part of BNY Mellon’s security information and event management processes. Logs are retained in accordance with law applicable to BNY Mellon’s provision of the services as well as BNY Mellon’s applicable policies. BNY Mellon uses various tools in conjunction with such logs, which may include behavioral analytics, security monitoring case management, network traffic monitoring and analysis, IP address management and full packet capture.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.