Overhead Rates The Engineer shall use the provisional overhead rate indicated in Attachment E. If a periodic escalation of the provisional overhead rate is specified in Attachment E, the effective date of the revised provisional overhead rate must be included. For lump sum contracts, the overhead rate remains unchanged for the entire contract period.
Hiring Rates The hiring rates of pay for new employees shall be at the minimum of the appropriate range as outlined in Appendix "A", except where there is agreement between the Employer and the Union to hire above the minimum.
Sleeping Room Rate(s) A. The Contractor shall provide sleeping rooms to the Attendees at the following rate during the Program: i. For single occupancy room, $@@@.@@ per night per room. B. The Contractor agrees that it will waive all applicable taxes and surcharges for Attendees listed on the Master Account Approval List, pursuant to the Hotel/Motel Transient Occupancy Tax Waiver (Exemption Certificate for State Agencies) form signed by the Judicial Council and included in this Agreement in Exhibit H. C. The Contractor may ▇▇▇▇ tax and/or surcharges, and/or tourism fees, if any, in addition to as included in the sleeping room rate, as set forth in this provision. D. The Contractor shall extend the sleeping room rate to Attendees two (2) Days before the Program and two (2) Days after the Program based on availability.
FIXED RATES If a fixed rate is in this Agreement, it is based on an estimate of the costs for the period covered by the rate. When the actual costs for this period are determined, an adjustment will be made to a rate of a future year(s) to compensate for the difference between the costs used to establish the fixed rate and actual costs.
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.