GROUNDING AND BONDING Clause Samples
GROUNDING AND BONDING. Winstar at its expense will ensure that any microwave equipment placed on the rooftop collocation space or in the building shall be grounded and bonded according to BellSouth’s standards which shall be at a minimum consistent with industry standards. BellSouth agrees that grounding and bonding requirements shall be applied in parity to itself and other Interconnectors for similar types of equipment.
GROUNDING AND BONDING. Fuzion at its expense will insure that any microwave equipment placed on the rooftop collocation space or in the building shall be grounded and bonded according to BellSouth’s standards which shall be at a minimum consistent with industry standards. ▇▇▇▇▇▇▇▇▇ agrees that grounding and bonding requirements shall be applied in parity to itself and other Interconnectors for similar types of equipment.
GROUNDING AND BONDING. Module ground wiring splices shall be made with irreversible crimp connectors. • All exposed ground wiring must be routed above the lower surface of any structural framing.
GROUNDING AND BONDING. A. All components of the Telecommunications system shall be bonded and grounded in accordance with ANSI/TIA-607-C “Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications”.
▇. ▇▇▇▇ equipment cabinets, building entrance terminals to the ground bar in each telecom room with #6 AWG ground conductors. Provide a separate ground conductor for each item. Do not daisy chain ground conductors.
GROUNDING AND BONDING. CLEC-1 at its expense will ensure that any microwave equipment placed on the rooftop collocation space or in the building shall be grounded and bonded according to BellSouth’s standards which shall be at a minimum consistent with industry standards. BellSouth agrees that grounding and bonding requirements shall be applied in parity to itself and other Interconnectors for similar types of equipment.
GROUNDING AND BONDING. All power supplies shall be grounded. The neutral side of the power drop shall be continuous and not fused. The neutral line shall also be bonded to the power supply cabinet. The cabinet shall be connected to an earth ground at the pole. In areas where a power utility has a ground wire running down the pole, the cabinet can be connected to it if the power utility permits. Where a power utility vertical ground wire is not available, the Licensee must place a ground rod. All metallic structures on a common pole shall be bonded to each other, to the Licensor's strand and to the Licensee's strand.
GROUNDING AND BONDING. 1 ALL GROUNDING AND BONDING REQUIREMENTS SHALL BE IN COMPLIANCE WITH ALL APPLICABLE CEC CODES AND AHJ REGULATIONS, WHICHEVER IS MORE STRINGENT. .2 ALL EQUIPMENT AND EXPOSED NON-CURRENT-CARRYING METAL CONDUITS AND PARTS SHALL BE PERMANENTLY AND EFFECTIVELY GROUNDED TO MEET ALL APPLICABLE REQUIREMENTS OF THE MOST RECENT VERSION OF THE CEC. .3 THE FEED BONDING CONDUCTOR SHALL BE SECURED (WRAPPED AROUND UNBROKEN) TO THE GROUNDING SCREW OF EACH OUTLET/BOX, BEFORE CONNECTING TO THE OTHER GROUNDING CONDUCTORS, AND/OR PROVIDING A PIG-TAIL LEAD FOR DEVICE TERMINATIONS. .4 ALL GROUND WIRES SHALL BE TWISTED TOGETHER WITH A SCREW-ON TYPE WIRE CONNECTOR, AND THEN PLACED IN REAR OF OUTLET BOX IN SUCH A MANNER AS TO MINIMIZE OBSTRUCTIONS. DESCRIPTION REV NO. DATE ISSUED FOR TENDER 0 16-MAR-2022 - - - - - - - - - - - - - - - - - - - - - - - - - - - 17/03/22 DRAWN BY: ▇.▇▇▇▇▇▇▇▇▇▇▇▇ CHECKED BY: ▇.▇▇▇▇▇▇▇ SCALE: NTS CLIENT: COBEQUID HOUSING AUTHORITY DATE: FEB. 08, 2022 SHEET SIZE: ARCH-D PROJECT NAME: PF-2021-025 PARKVIEW TERRACE DHW SYSTEM RENEWAL DRAWING NAME: ELECTRICAL SPECIFICATION DRAWING NUMBER: 800 TO NSPI TRANSFORMER TO NSPI TRANSFORMER 3 - 3 x 1C 500 KCMIL 3 - 3 x 1C 500 KCMIL MAIN 1200A, 208/120V, 3ɸ, 4W SWITCHBOARD (EXISTING) MAIN 1200A, 208/120V, 3ɸ, 4W SWITCHBOARD (EXISTING) 1200A 4P 100A 100A 100A 100A 100A 100A 3P 3P 3P 3P 3P 3P 3 x 1C #3AWG CU + 1 x 1C #8AWG BOND IN EXISTING CONDUIT 100A, 208/120V PANEL #1 (EXISTING) (SEE NOTE 1) 100A, 208/120V PANEL #1 (EXISTING) 100A 100A 100A 100A 3P 3P 1 3P 3P 1 15A 15A 1P (SEE NOTE 3) 1P 100A, 208/120V 100A 100A LOAD CENTRE x3 x3 1 x 2C # AWG AC9 2 x 1C #14AWG CU + 1 x 1C #14AWG BONDIN 16mm EMT 1 x 3C #3AWG CU 100A CIRCULATOR TECK90 3P PUMPS NEW NEW HOT WATER HOT WATER HEATER #1 HEATER #2 30A/2HP 30A/2HP (SEE NOTE 2) 2 2P (SEE NOTE 3) 2 2P (SEE NOTE 3) HOT WATER HOT WATER HEATER #1 HEATER #2 TO BE REMOVED TO BE REMOVED 1 x 2C #14AWG CU 1 x 2C #14AWG CU TECK90 TECK90 WATER HEATER STORAGE TANK EXISTING PARTIAL SINGLE LINE DIAGRAM CIRCULATOR PUMP CIRCULATOR PUMP (NEW) (NEW) NTS REVISED PARTIAL SINGLE LINE DIAGRAM NTS NOTES 1. CONTRACTOR SHALL CONFIRM THE SIZE AND CONDITION OF EXISTING CONDUITS FROM MAIN SWITCHBOARD TO EXISTING HOT WATER HEATER DISCONNECT SWITCHES. IF SUITABLY SIZED PER CEC AND IN GOOD CONDITION, CONTRACTOR SHALL REUSE EXISTING CONDUITS TO FEED THE HOT WATER HEATER DISCONNECT SWITCHES. IF THE EXISTING CONDUITS ARE NOT SUITABLE TO BE REUSED, CONTRACTOR SHALL ADVICE THE PROJECT MANAGER. 2. CONTRACTOR SHALL ...
GROUNDING AND BONDING. Mounting height shall be 3’-6” to bottom of cabinet from finished grade. • The RTU cabinet shall be bonded to the customer’s grounding electrode system. • Where metallic conduits are installed, they shall have nylon insulated ground bushing at entrances. Metallic conduits shall be bonded to the Customer’s local equipment grounding system in accordance with the NEC.
GROUNDING AND BONDING. It is Utility’s policy and practice to ground all Poles installed as part of Utility’s distribution system and streetlight service. Licensee is required to install its own specific ground electrode and ground bond for its Wireless Facilities.
GROUNDING AND BONDING. Mounting height shall be 3’-6” to bottom of cabinet from finished grade. • The RTU cabinet shall be bonded to the customer’s grounding electrode system. SCADA Communications Requirements Version 2.0 NY- 20627 Dahowa Hydro 12,265 kW Hydro-Electric Generator, Greenwich, NY 10/18/2019