Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 49 contracts
Sources: Development Credit Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 33 contracts
Sources: Development Credit Agreement, Project Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 150,000 equivalent or more each.
Appears in 19 contracts
Sources: Loan Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.
Appears in 19 contracts
Sources: Project Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 350,000 equivalent or more each.
Appears in 11 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 7 contracts
Sources: Development Financing Agreement, Development Credit Agreement, Development Financing Agreement
Grouping of contracts. To the extent practicable, contracts for goods and technical services shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 6 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 350,000 equivalent or more eacheach respectively.
Appears in 5 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 5 contracts
Sources: Development Credit Agreement, Loan Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost $100,000 200,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 4 contracts
Sources: Development Credit Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 $ 250,000 equivalent or more each.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 300,000 equivalent or more each.
Appears in 4 contracts
Sources: Development Credit Agreement, Loan Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost the equivalent of $100,000 equivalent 200,000 or more each.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each.
Appears in 4 contracts
Sources: Global Environment Facility Trust Fund Grant Agreement, Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, contracts for goods works shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each, and contracts for goods and equipment shall be grouped in bid packages estimated to cost $ 150,000 equivalent or more each.
Appears in 4 contracts
Sources: Development Credit Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $US$100,000 equivalent or more each.
Appears in 4 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 3 contracts
Sources: Loan Agreement, Development Credit Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 US$200,000 equivalent or more each.
Appears in 3 contracts
Sources: Global Environment Facility Trust Fund Grant Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 3 contracts
Sources: Financing Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each and contracts for works shall be grouped in bid packages estimated to cost $3,000,000 equivalent or more each.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 3 contracts
Sources: Development Credit Agreement, Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost respectively $100,000 350,000 and $5,000,000 equivalent or more each.
Appears in 3 contracts
Sources: Loan Agreement, Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicablepossible, contracts for goods and services (other than consultants’ services) shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each and contracts for works shall be grouped in bid packages to cost $10,000,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 150,000 equivalent or more each and contracts for works shall be grouped in bid packages estimated to cost $300,000 or more each.
Appears in 2 contracts
Sources: Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more eacheach and contracts for works shall be grouped in bid packages estimated to cost $10,000,000 equivalent or more.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost respectively $100,000 150,000 and $200,000 equivalent or more each.
Appears in 2 contracts
Sources: Development Credit Agreement, Trust Fund Grant Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 US$400,000 equivalent or more each.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, contracts for works and goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for works and goods shall be grouped in bid packages estimated to cost cost, respectively, $100,000 10,000,000 and $500,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Grant Agreement, Grant Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 2,500,000 equivalent or more each.
Appears in 2 contracts
Sources: Shiraz Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, practicable contracts for the provision of goods shall be grouped in into bid packages packages, each estimated to cost $100,000 500,000 equivalent or more eachmore.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for works shall be grouped in bid packages estimated to cost $500,000 or more each and goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.
Appears in 2 contracts
Sources: Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for works and goods shall be grouped in bid packages estimated to cost each more than the equivalent of $100,000 equivalent 3,000,000 or more each$250,000, respectively.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more eachand $3,000,000 equivalent or more, respectively.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for (i) works shall be grouped in bid packages estimated to cost $500,000 equivalent or more each, and (ii) contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Development Credit Agreement, Development Credit Agreement
Grouping of contracts. To the extent practicablepossible, contracts for goods and services (other than consultants’ services) shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more eacheach and contracts for works shall be grouped in bid packages estimated to cost $10,000,000 or more.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost respectively $100,000 250,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for works and goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent extend practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost the equivalent of $100,000 equivalent 5,000,000 or more each.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, contracts for the purchase of goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Project Agreement, Andhra Pradesh Agreement
Grouping of contracts. To the extent practicable, contracts for works shall be grouped in bid packages estimated to cost $15,000,000 equivalent or more each, and contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, contracts contract for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Project Agreement, Project Agreement
Grouping of contracts. To the extent practicable, contracts for works shall be grouped in bid packages estimated to cost $500,000 equivalent or more each, and contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 2 contracts
Sources: Loan Agreement, Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost the equivalent of $100,000 equivalent or more each.
Appears in 1 contract
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 50,000 equivalent or more each.
Appears in 1 contract
Sources: Project Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, (i) contracts for goods (except vehicles) shall be grouped in bid packages estimated to cost more than $200,000 equivalent each and (ii) contracts for vehicles shall be grouped in bid packages estimated to cost more than $100,000 equivalent or more each.
Appears in 1 contract
Sources: Project Agreement
Grouping of contracts. To the extent practicable, contracts for goods goods, works, and supply and installation contracts shall be grouped in bid packages estimated to cost $100,000 US$200,000 equivalent or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost $100,000 250,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Project Agreement
Grouping of contracts. To the extent practicable, supply and installation contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Trust Fund Grant Agreement
Grouping of contracts. To the extent practicablepossible, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, practicable contracts for goods shall be grouped in bid packages estimated to cost $100,000 150,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods equipment shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Project Agreement
Grouping of contracts. To the extent practicable, contracts for goods under a supply and installation contract shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Trust Fund Grant Agreement
Grouping of contracts. To the extent practicable, contracts for goods and equipment shall be grouped in bid packages estimated to cost $100,000 150,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, practicable contracts for the provision of goods shall be grouped in into bid packages packages, each estimated to cost $100,000 150,000 equivalent or more each.more, and contracts for works shall be grouped into bid packages, each estimated to cost $1,500,000 equivalent or more. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost more than $100,000 50,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost the equivalent of one hundred thousand dollars ($100,000 equivalent 100,000) or more each.
Appears in 1 contract
Grouping of contracts. To the extent practicable, contracts for goods equipment, information technology and supplies shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 300,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods (except vehicles) shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.
Appears in 1 contract
Sources: Uttaranchal Project Agreement
Grouping of contracts. To the extent practicable, practicable contracts for the provision of goods shall be grouped in into bid packages packages, each estimated to cost $100,000 150,000 equivalent or more each.more, and contracts for works shall be grouped into bid packages, each estimated to cost $500,000 equivalent or more. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, practicable contracts for the provision of goods shall be grouped in into bid packages packages, each estimated to cost $100,000 150,000 equivalent or more eachmore.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more eacheach for goods and $500,000 equivalent or more each for works.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost $100,000 the equivalent of DEM 1,500,000 or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost $100,000 the equivalent of DEM750,000 or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods and works shall be grouped in bid packages estimated to cost respectively $100,000 and $400,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more eacheach and contracts for works shall be grouped in bid packages estimated to cost $10,000,000 or more.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 □300,000 equivalent or more each, and contracts for works shall be grouped in bid packages estimated to cost □3,000,000 or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 500,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each, and contracts for works shall be grouped in bid packages estimated to cost $150,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each and contracts for works shall be grouped in bid packages estimated to cost $200,000 equivalent or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in into bid packages estimated to cost the equivalent of $100,000 equivalent 350,000 or more each.
Appears in 1 contract
Sources: Loan Agreement
Grouping of contracts. To the extent practicable, contracts for goods Goods shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Global Environment Facility Trust Fund Grant Agreement
Grouping of contracts. To the extent practicable, (i) contracts for goods (except vehicles) shall be grouped in bid packages estimated to cost $200,000 equivalent or more each and (ii) contracts for vehicles shall be grouped in bid packages estimated to cost $100,000 equivalent or more each.
Appears in 1 contract
Sources: Project Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 200,000 (two hundred thousand dollars) equivalent or more each.
Appears in 1 contract
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 equivalent 400,000 or more each.
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods Goods shall be grouped in bid packages estimated to cost $US$100,000 equivalent or more each.. Part C: Other Procurement Procedures
Appears in 1 contract
Sources: Global Environment Facility Trust Fund Grant Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 150,000 equivalent or more each...
Appears in 1 contract
Sources: Development Credit Agreement
Grouping of contracts. To the extent practicable, contracts for goods shall be grouped in bid packages estimated to cost $100,000 250,000 equivalent or more each.
Appears in 1 contract
Sources: Development Grant Agreement