Handling and Storing Test Panels Sample Clauses

The "Handling and Storing Test Panels" clause sets out the requirements and procedures for the proper management of test panels during a project. It typically details how test panels should be transported, stored, and protected to prevent damage or contamination, and may specify environmental conditions such as temperature or humidity controls. By establishing clear standards for handling and storage, this clause ensures the integrity and reliability of test panels, thereby supporting accurate testing results and minimizing the risk of compromised samples.
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. 4 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - 0-5 - - - - - A Asphalt Plant Mix 467M ▇▇▇ ▇▇- ▇▇▇ - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ 0-5 - - - - - A AST, Sediment Control Stone 57M - ▇▇▇ ▇▇- ▇▇▇ - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ 0-8 - - - - A AST 67 - - ▇▇▇ ▇▇- ▇▇▇ - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 14M - - - - - ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - 0-8 - A Asphalt Plant Mix, AST, Weep Hole Drains, Str. Concrete 9 - - - - - 100 85- ▇▇▇ ▇▇- ▇▇ - 0-10 - A AST ABC - ▇▇▇ ▇▇- ▇▇ - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - ▇▇▇ ▇▇- ▇▇▇ - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization Light- weightC - - - - 100 80- 100 5- 40 0-20 - 0-10 - 0-2.5 AST C203782 I-5309, I-5836 Alamance County with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 467M ▇▇▇ ▇▇-▇▇▇ - 35-70 - 0-30 0-5 - - - - A Asphalt Plant Mix 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 67 - - ▇▇▇ ▇▇-▇▇▇ - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains ABC - ▇▇▇ ▇▇-▇▇ - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST G-43 DN00122 following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and (C) Not more than 20% of the rock is less than 2” in diameter. No rippable rock will be permitted. Page 10-40, Tables 1018-1 and 1018-2, PIEDMONT, WESTERN AND COASTAL AREA CRITERIA FOR ACCEPTANCE OF BORROW MATERIAL, under second column in both tables, replace second row with the following: Page 10-47, Subarticle 1024-3(B), Approved Sources, lines 16-18, replace the second sentence of the second paragraph with the following: Page 10-115, Subarticle 1074-7(B), Gray Iron Castings, lines 10-11, replace the first two sentences with the following: TABLE 1078-1 REQUIREMENTS FOR CONCRETE Page 10-126, Table 1078-1, REQUIREMENTS FOR CONCRETE, replace with the following: Property 28 Day Design Compressive Strength 6,000 psi or less 28 Day Design Compressive Strength greater than 6,000 psi Page 10-151, Article 1080-4, INSPECTION AND SAMPLING, lines 18-22, replace (B), (C) and (D) with the following:
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Use Table 1000-1 to determine the maximum allowable water- cementitious material (cement + fly ash) ratio for the classes of concrete listed. the table. 4 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - 0-5 - - - - - A Asphalt Plant Mix 467M ▇▇▇ ▇▇- ▇▇▇ - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ 0-5 - - - - - A AST, Sediment Control Stone 57M - ▇▇▇ ▇▇- ▇▇▇ - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ 0-8 - - - - A AST 67 - - ▇▇▇ ▇▇- ▇▇▇ - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 9 - - - - - 100 85- ▇▇▇ ▇▇- ▇▇ - 0-10 - A AST ABC - ▇▇▇ ▇▇- ▇▇ - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - ▇▇▇ ▇▇- ▇▇▇ - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization 65
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 57M - ▇▇▇ ▇▇-▇▇▇ - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 67 - - ▇▇▇ ▇▇-▇▇▇ - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - ▇▇▇ ▇▇-▇▇ - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - ▇▇▇ ▇▇- ▇▇▇ - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C203871 I-5833 ▇▇▇▇▇▇▇▇ County with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 57M - ▇▇▇ ▇▇-▇▇▇ - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 67 - - ▇▇▇ ▇▇-▇▇▇ - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - ▇▇▇ ▇▇-▇▇ - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - ▇▇▇ ▇▇- ▇▇▇ - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C203929 I-5765 Davie County with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. 4 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - 0-5 - - - - - A Asphalt Plant Mix 467M ▇▇▇ ▇▇- ▇▇▇ - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 57M - ▇▇▇ ▇▇- ▇▇▇ - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ 0-8 - - - - A AST 67 - - ▇▇▇ ▇▇- ▇▇▇ - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 14M - - - - - ▇▇▇ ▇▇- ▇▇ ▇-▇▇ - 0-8 - A Asphalt Plant Mix, AST, Weep Hole Drains, Str. Concrete 9 - - - - - 100 85- ▇▇▇ ▇▇- ▇▇ - 0-10 - A AST ABC - ▇▇▇ ▇▇- ▇▇ - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - ▇▇▇ ▇▇- ▇▇▇ - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization Light- weightC - - - - 100 80- 100 5- 40 0-20 - 0-10 - 0-2.5 AST C203861 2016CPT.06.08.10091.1, etc R-24 Bladen and Columbus Counties with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 57M - ▇▇▇ ▇▇-▇▇▇ - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - ▇▇▇ ▇▇-▇▇ - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - ▇▇▇ ▇▇- ▇▇▇ - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C204026 I-5956 Guilford & Alamance Counties with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 57M - ▇▇▇ ▇▇-▇▇▇ - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - ▇▇▇ ▇▇-▇▇ - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - ▇▇▇ ▇▇- ▇▇▇ - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization C204089 2018CPT.13.01.10111, etc. Buncombe County with the following:
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Shoulder Drain, AST, Weep Hole Drains,

Related to Handling and Storing Test Panels

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.