Handling of Plants Clause Samples

Handling of Plants. The Contractor shall handle plants carefully to reduce as far as possible injury by mechanical shock and crushing.

Related to Handling of Plants

  • Installation and Use You may install and use the Software only for the number of licenses acquired by you. In order to exercise your rights to the Software under this Agreement, you must activate your copy of the Software in the manner described during the launch sequence.

  • System Use (a) An electronic site access system may be used on site, subject to the requirements of this statement. (b) The system operates via: (i) a facial recognition device; and (ii) an electronic gate. (c) The system will be installed at the access and egress point/s of the site and will only be utilised to identify presence on site. (d) The purpose for which the electronic site access system will be implemented is to ensure: (i) avoiding unauthorised access to site; (ii) confirmation and co-ordination of effort in emergency situations; and (iii) confirmation that all entrants to site have received a site specific induction; (e) The only personal data collected by the system is a site entrant’s: (i) image; (ii) first & last name; (iii) mobile phone number; (iv) email address; and (v) employer’s name. (the Collected Data) (f) The Collected Data will only be held or used for the purposes specified above, unless otherwise by consent or required by law. (g) The Employer will not use the electronic site access control system to verify who was on a site at a particular time for the purpose of: (i) evaluating whether a variation claim regarding labour costs made by a subcontractor can be substantiated; (ii) taking disciplinary action against an Employee, or assisting a subcontractor to take disciplinary action against its own employees, regarding their start and finish times; or (iii) otherwise generally tracking a worker’s movements whilst on the site.

  • Transmission and Routing of Exchange Access Traffic PURSUANT TO 251(c)(2) 13 ARTICLE VI MEET-POINT BILLING ARRANGEMENTS 14 ARTICLE VII BLV/BLVI TRAFFIC 16 7.1 Busy Line Verification 16 7.2 Busy Line Verification Interrupt 16 7.3 BLV/BLVI Traffic 16 7.4 BLV/BLVI Compensation 16

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.