Increases in Chargeable Demand for a Demand Customer Delivery Point Clause Samples

Increases in Chargeable Demand for a Demand Customer Delivery Point. (a) Where a Delivery Point is equipped with Daily Meter Reading Facilities, JGN may increase the Chargeable Demand to equal the ninth-highest actual Quantity of Gas withdrawn at that Delivery Point in any one Day over the previous 12 month period (or if data from the Daily Meter Reading Facilities is not available for that 12 month period, any lesser period of time for which such information is available). (b) Where a Delivery Point is not equipped with Daily Meter Reading Facilities, JGN may increase the Chargeable Demand to equal the average daily Quantity of Gas withdrawn from that Delivery Point during any Calendar Month during the previous 12 month period. (c) Where JGN increases the Chargeable Demand for a Delivery Point pursuant to clauses 5.2(a) or 5.2(b), the increase shall take effect from the first Day of the Calendar Month immediately following the Calendar Month in which the Daily or monthly consumption (as applicable) occurred that was used to calculate the increased Chargeable Demand. That Day will be the “Demand Reset Date” for that Delivery Point with respect to that Chargeable Demand. (d) Where the MHQ or MDQ for a Demand Customer Delivery Point is increased under clause 4.2, JGN may increase the Chargeable Demand for a Delivery Point to the extent necessary for the Chargeable Demand to meet the requirements of clause 5.1(b) or 5.1(c). The increase will take effect on the date reasonably determined by JGN which must be on or after the date on which the increased MHQ or MDQ first applied. The date so determined will be the "Demand Reset Date" for that Delivery Point with respect to that Chargeable Demand.

Related to Increases in Chargeable Demand for a Demand Customer Delivery Point

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Unbundled Voice Loops (UVLs) 2.2.1 BellSouth shall make available the following UVLs:

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • Software Use Case Red Hat Enterprise Linux Developer Suite Subscription Services for Red Hat Enterprise Linux Developer Suite are available for Development Purposes only.