Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings • Determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 4.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 Energy Management System - Demand Controlled Ventilation B 4.3 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls B 8 Heating System - Boiler Replacement B Interaction: Demand Control Ventilation (DCV) Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: Energy Management system will continuously monitor post-retrofit outdoor air temperature, space temperature, and unit status. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. JCI will also monitor and record the setpoint changes during the Guarantee Period. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously monitor post-retrofit CO2 levels, outside air temperature, and outside air damper position. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously the status of the exhaust fan and will compare against the schedule. The date-time stamp will be included. ECM 8: Heating System - Boiler Replacement M&V Option: NEMVP-B (Annual)
Appears in 1 contract
Sources: Performance Contract
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the specifications in the DEA and meeting all functional tests and provide commissioning report for each unit An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings • Determines determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 4.1 ECM 3.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 ECM 3.2 Energy Management System - Exhaust Fan/Relief Damper Control B ECM 3.3 Energy Management System - Demand Controlled Ventilation B 4.3 ECM 3.4 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls Optimal Start B 8 Heating ECM 3.1: Energy Management System - Boiler Replacement Temperature Setback M&V Option: NEMVP-B Interaction: Demand Control Ventilation (DCVcontinuous) Measuring Equipment: Energy Management System Measuring Equipment Accuracy: ±3% of measurement range Measuring Equipment Calibration: Not applicable. Measurement Period: 15-15 minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: During detail audit on site it was documented that the interior temperature was maintained at occupied levels all day and night. Energy Management system will continuously monitor post-retrofit outdoor air temperature, space temperature, and unit statusset point temperatures outside air temperature for a sample set of rooms within each of the heating/cooling zones. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. JCI will also monitor and record the setpoint changes during the Guarantee Period. ECM 3.2: Energy Management System - Exhaust Fan/Relief Damper Control M&V Option: NEMVP-B (continuous) Measuring Equipment: Energy Management System Measurement Period: 15-15 minute samples Measurement Frequency: Continuous measurement Energy Management system will During detail audit on site it was documented that the district’s exhaust fans operated continuously monitor post-retrofit CO2 levels, outside air temperature, and outside air damper position. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously the status of the exhaust fan and will compare against the schedule. The date-time stamp will be included. ECM 8: Heating System - Boiler Replacement M&V Option: NEMVP-B (Annual)24/7.
Appears in 1 contract
Sources: Construction Contract
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. An annual visual inspection of a sample of units will occur to ensure Verify if they perform in accordance with the equipment is still specifications in place the DEA and operational. meeting all functional tests Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement contract needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the AgreementM&V period. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings savings. • Determines an energy (and cost) savings value using measured data taken as needed throughout the M&V termterm of the contract. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 4.1 ECM 3.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 ECM 3.2 Energy Management System - Demand Controlled Ventilation B 4.3 ECM 3.3 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls Optimal Start B ECM 8 Heating Renewable Energy- Photovoltaic Electric Generation B ECM 9 Plug Load Controllers B ECM 3.1: Energy Management System - Boiler Replacement B InteractionTemperature Setback M&V Option for Guarantee Year 1 for thermal savings: Demand Control Ventilation (DCV) NEMVP-C Measuring Equipment: Energy Management System Measuring Equipment Accuracy: ±3% of measurement range Measuring Equipment Calibration: Not applicable. Measurement Period: 15-15 minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: During detail audit on site it was documented that the interior temperature was maintained at occupied levels all day and night. Energy Management system will continuously monitor post-retrofit outdoor space temperature and outside air temperature, space temperature, and unit status. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. JCI ▇▇▇▇▇▇▇ Controls will also monitor and record the setpoint changes during the Guarantee PeriodMeasurement and Verification (M&V) period. Measuring EquipmentECM 3.2: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously monitor post-retrofit CO2 levels, outside air temperature, and outside air damper position. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously the status of the exhaust fan and will compare against the schedule. The date-time stamp will be included. ECM 8: Heating System - Boiler Replacement – Demand Controlled Ventilation M&V OptionOption for Guarantee Year 1 for thermal savings: NEMVP-B (Annual)C
Appears in 1 contract
Sources: Performance Contract