Installation of Meter Sample Clauses

The 'Installation of Meter' clause defines the responsibilities and procedures for setting up a utility meter at a specified property or premises. Typically, it outlines who is responsible for providing, installing, and maintaining the meter—such as the utility provider or the property owner—and may specify standards for installation, access requirements, and timing. This clause ensures that accurate measurement of utility usage can occur, thereby enabling correct billing and accountability for consumption.
Installation of Meter. System Owner shall install a Meter at each of the Delivery Point to measure the amount of Output delivered by System Owner to Host Customer.
Installation of Meter. If a Meter is not already installed for each Connection Point for a Site, the Customer must arrange for a Meter to be installed at the Customer’s cost as soon as possible. Alternatively, Alinta Energy may arrange for a Meter to be installed on the Customer ’s behalf at the Customer’s cost.
Installation of Meter. 1.1 The meter shall be installed within the premises and at the location shown in the drawings attached with the application by the consumer for sanction and the consumers shall be responsible for safety of the meter against pilferage or damage misuse or mis- handling. The consumer shall keep the meter and fittings in chamber and the fitting in clean condition. If he fails to do so inspite of a notice from the Contractor, within seven days, the Contractor may get the meter, chamber and fittings cleane at the cost and risk of the consumer. 1.2 If the meter goes out of order the consumer shall replace the same either by a new one or by a meter repaired at the workshop of the Contractor or the meter shall be got tested at the workshop of the Contractor within two months from the date of the notice given by the Consumer. 1.3 Where a consumer does not repair or replace his defective meter within a prescribed period of two months, The Contractor reserves the right to fix the Contractors tested water meter temporarily, in which event the water meter of the consumer shall be repaired and refixed at the cost of the consumer. The charges for fixing the meter shall be recovered through bills from consumer. 1.4 The meter should be installed in such a way that it shall always be full of water and partial flow shall not occur. 1.5 The Contractor shall replace all existing meters in phases and install meters owned by the Contractor as per F (IV) above.
Installation of Meter. System Owner shall install the Meter, in accordance withthe requirements of the California Solar Initiative, at the Point of Delivery to measure accurately the amount of Output delivered by System Owner to Host Customer.
Installation of Meter. APPLICANTS shall request meter installation in writing. All fees shall be refundable until APPLICANTS requests meter to be installed.

Related to Installation of Meter

  • Installations Any special carpentry, wiring, electrical or other work, gas, steam, water and drainage connection shall be installed at Exhibitor’s expense, and in accordance with the building and Management’s direction.

  • Installation and Maintenance Except for the bi‐directional and production metering equipment owned by the City, all equipment on Customer’s side of the delivery point, including the required disconnect device, shall be provided and maintained in satisfactory operating condition by Customer and shall remain the property and responsibility of the Customer. The City will bear no responsibility for the installation or maintenance of Customer’s equipment or for any damage to property as a result of any failure or malfunction thereof. The City shall not be liable, directly or indirectly for permitting or continuing to allow the interconnection of the Facility or for the acts or omissions of Customer or the failure or malfunction of any equipment of Customer that causes loss or injury, including death, to any party.

  • Installation When installation is required, the Contractor shall be responsible for placing and installing the Commodities or parts in the required locations at no additional charge. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the Commodity or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, tools, rigging, labor, and materials required to install or replace the Commodities or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.