Installation of Meters. Each Participant shall install a Metering Station at each Connection Point where the Flow equals or exceeds 23,500 gpd or where 100 EDUs are connected to the Collection System served by such Connection Point. Where a Connection Point is established for a Collection System which initially has a Flow of less than gpd or to which less than 100 EDUs are connected and the Flows increase, MWA and/or MMA shall each install a Metering Station within six months after average annual Flows equal or exceed gpd or 100 or more EDUs are connected to such Collection System.
Appears in 2 contracts
Sources: Inter Municipal Agreement, Inter Municipal Agreement