Installation of Proposed Monitoring ▇▇▇▇▇ Clause Samples

Installation of Proposed Monitoring ▇▇▇▇▇. All monitoring ▇▇▇▇▇ will be constructed of two-inch PVC casing with 0.1-inch slotted PVC well screening across the water table. No glue will be used to thread the casing lengths. The ▇▇▇▇▇ will be constructed such that a minimum of 2.0 foot of screening will extend above the water table and approximately 8.0 feet of screening will extend below the water level. The annular space between well screen and the borehole will be backfilled with clean #1 silica sand to a depth of one to two feet above the well screen. A one-foot thick bentonite seal will be poured down the borehole above the sand pack and allowed to hydrate before grouting the remaining annular space with cement. Note: the length of the PVC screen, sand filter, and bentonite seal may be reduced (in that order) in order to accommodate a shallow water table. A locked cap with vent will be installed at the top of the PVC riser. ▇▇▇▇▇ will be completed as either stickup or drive-over ▇▇▇▇▇, according to Site conditions, and will be protected by locked, metal casings. All monitoring ▇▇▇▇▇ will be surveyed vertically to the nearest 0.01 foot and horizontally to an accuracy of one-tenth of a second latitude and longitude. Well locations and other surveyed data will be provided in the final RIR on a certified map prepared by a State certified surveyor. The survey will document the vertical elevations of the top of the casing pipe and the ground surface elevation adjacent to each well. Well construction logs showing components and details of well casing, well screen, filter pack, annular seal, and associated items will be provided in the final report.

Related to Installation of Proposed Monitoring ▇▇▇▇▇

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Installation Waiver Company will waive the one-time installation charges associated with the implementation of Services within the 48 contiguous States of the U.S. provided under this Agreement except for the following services: (i) eDSL, (ii) VPN, (iii) Internet Dedicated OC3, OC12, OC48, Gig-E, (iv) PTT / third party services (including International Access and Company International), (v) Data Center, (vi) Paging, (vii) Managed Services, (viii) CPE, (ix) Enhanced Call Routing, (x) Local Disaster Recovery, (xi) Audio, Video and Net Conferencing, (xii) Voice over IP Services, (xiii) Security Services, (xiv) Non-Listing/Non-Published Service, (xv) Telecommunications Service Priority, and (xvi) Services provided by Company incumbent local exchange carriers (“ILECs”) or by Cellco Partnership and its affiliates d/b/a Company Wireless. Usage charges, monthly recurring charges, expedite charges, change charges, surcharges, charges for an unlisted or non-published number, any charges imposed by third parties (including access, egress, jack, or wiring charges), taxes or tax-like surcharges, or other Governmental Charges will not be waived.

  • Installation When installation is required, the Contractor shall be responsible for placing and installing the Commodities or parts in the required locations at no additional charge. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the Commodity or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, tools, rigging, labor, and materials required to install or replace the Commodities or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Installation and Use You may install and use the Software only for the number of licenses acquired by you. In order to exercise your rights to the Software under this Agreement, you must activate your copy of the Software in the manner described during the launch sequence.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.