Installation Plan. A legible general site plan or map drawing of the installation shall be included. Detail architectural or construction drawings are not required • The plan or map shall identify the location of the source of generation, any existing generation, energy storage, production meter, DER disconnect switch and service meter.
Appears in 2 contracts
Sources: Der Interconnection Agreement, Der Interconnection Agreement