Installation Site. The contractor will be solely responsible for unloading the machine from the transporter to the intended area. The client's project manager is to be informed if any lifting equipment, forklifts or personnel are required. For floor-standing machines, confirmation is required of the relevant requirements, in particular its load-bearing capacity and the levelness of the floor. If any foundations are required, then the bidder is to calculate them and indicate the positions on the foundation drawings. The bidder is responsible for including the machine in the planning. Details of where the interfaces for energy and media supplies are to be must be provided, as are the necessary details for infeeding (size of individual components, weights etc.). Detailed information must be given of any services to be provided by the client. The necessary areas for waste disposal, material supplies and removal are to be stated. The required protection zones, retention of fire-fighting water and necessary measures for the adherence to environmental EU guidelines, national laws and directions, unless implemented by the contractor, are to be stated. The required information is to be provided no later than on placement of the order.
Appears in 3 contracts
Sources: General Specifications for Work Equipment, Plant and Machinery, General Specifications for Work Equipment, Plant and Machinery, Safety and Compliance Agreement