Common use of Installation Work Clause in Contracts

Installation Work. a) SPD will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS No. dated of ▇▇▇▇▇▇. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD shall commission the System with a capacity of approximately kWp. d) SPD shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carry out any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost.

Appears in 2 contracts

Sources: Power Purchase Agreement (Ppa), Power Purchase Agreement