Insulation Test. The meters shall be tested at pressure of 4kV for a period of 1 minute between all live terminals and earth.
Insulation Test. Unless agreed otherwise with the Engineer, all circuits required to operate at voltages in excess of 70 V shall have a peak test voltage of 2 kV rms. 50 Hz applied for 1 minute, and for all circuits required to operate at voltages of less than 70 V shall have a peak test voltage of 500 V d.c. applied for 1 minute. All structural metal work and metal chassis on one site shall be connected to earth at one point to the approval of the Engineer.
Insulation Test. Insulation tests for each loop to ground shall be in accordance with the latest edition of NEMA TS 1.
Insulation Test. The meters shall be tested at pressure of 4kV for a period of 1 minute between all love terminals and earth. (All data should be clear mentioned and shown in one table with the same numbering as shown in SCHEDULE (1) ) Item Description ▇▇▇▇▇▇▇▇'s reply 1 Name of manufacturer 2 Country of origin 3 type of meter 4 description of product 5 Operating system 6 manufacturing license 7 quality assurance certificate 8 standard IEC No……………..
Insulation Test. Insulation test, thickness, tensile strength, elongation, insulation resistance etc. shall be subjected to all the test at work specified in I.E.C 60502.
Insulation Test. Polarity test
Insulation Test for Power Supply Cables (medium voltage and low voltage) and continuity tests on all wiring including tests for correctness of connection.
Insulation Test. The insulation value shall test shall be conducted using a DC insulation test set (Megger) at 1000 volts DC. The test shall be completed and recorded on each of the following items: Main Bus, U2A, U2B and Gen 9. Each test shall last 1 min. and shall be conducted from A Phase to B Phase B Phase to C phase A phase to C phase A phase to Ground B phase to Ground C phase to Ground Neutral to Ground * note * Remove Neutral Disconnect Link December 12, 2012: Energizing U2 Main Switchboard: After all testing in complete with acceptable test values and the visual inspection found all conditions the main switchboard is ready to close. Install all covers except for the main circuit breaker. Re-install the Neutral disconnect link. Close the cover for the U2 main 5000 A circuit Breaker.
Insulation Test. Insulation value of grouped C.T.'s, secondary to earth, using 1kV megger .......................

Related to Insulation Test

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Stability Testing Patheon will conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within [***], after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications and cGMPs. Patheon will give Client all stability test data and results at Client’s request.

  • Alcohol Testing Alcohol testing will be conducted by using an evidential breath-testing device (EBT) approved by the National Highway Traffic Safety Administration. A screening test will be conducted first. This initial screening may be accomplished using a saliva test kit. If the result is an alcohol concentration level of less than 0.02 percent, the test is considered a negative test. If the alcohol concentration level is 0.02 percent or more, a second confirmation test using the EBT will be conducted. The procedures that will be utilized by the lab for collection and testing of the specimen are attached hereto as Appendix A.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.