INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate. 3.2 APTRANSCO and DISCOM may also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned estimate at its discretion duly collecting the supervision charges as per procedure in vogue. 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO and DISCOM authorities. If APTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCO/DISCOM as applicable. 3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO and DISCOM. 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder. 3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/metering arrangement as per Clause 4.1. 3.7 The Solar Power Developer shall deploy components/equipment for the SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 2 contracts
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/APTRANSCO/ DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and DISCOM may also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned estimate at its discretion duly collecting the supervision charges as per procedure in vogue.
3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO and DISCOM authorities. If APTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar generator /solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/instrumentation/ metering arrangement as per Clause 4.1.
3.7 The Solar Power Developer shall deploy components/components/ equipment for the STP/SPV complying with approved/approved/ minimum technical standards as per International Electro technical Electrotechnical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 2 contracts
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/TSTRANSCO or DISCOM will shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may also permit allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned approved estimate at its discretion duly collecting the supervision charges as per the procedure in vogue.
3.3 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall the necessary expenditure shall have to be borne by the Solar Power Developerexpenditure. The maintenance work of the connected bay together with equipment at the grid sub-sub- station and connected bay and equipment has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authoritiespersonnel. If APTRANSCO/Where TSTRANSCO or DISCOM carryout carries out the O&M Maintenance work, the power producer shall pay such the expenses to APTRANSCO/TSTRANSCO or DISCOM as applicable.
3.4 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with APTRANSCO and DISCOMTSTRANSCO or DISCOM as the case may be.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 3.4 The Solar Power Developer shall be responsible to operate the Project as envisaged under per this Agreement & and to provide appropriate facility/ instrumentation/facility or instrumentation or metering arrangement as per Clause 4.1.
3.7 3.5 The Solar Power Developer shall deploy components/use components or equipment for the SPV complying with approved/approved or minimum technical standards as per the International Electro Electro-technical Commission (“IEC”) & or Bureau of Indian Standards (“BIS”) or technical standards that are as specified prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 2 contracts
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/TSTRANSCO or DISCOM will shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer solar power developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may also permit allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned approved estimate at its discretion duly collecting the supervision charges as per procedure the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further in voguecase the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCO.
3.3 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure shall have to be borne by the Solar Power Developerexpenditure. The maintenance work of the connected bay together with equipment at the grid sub-station and connected bay and equipment interconnection substation has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authoritiespersonnel. If APTRANSCO/Where TSTRANSCO or DISCOM carryout carries out the O&M maintenance work, the solar power producer developer shall pay such the expenses to APTRANSCO/TSTRANSCO or DISCOM as applicable.. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,
3.4 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with APTRANSCO and DISCOMTSTRANSCO or DISCOM as the case may be.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/3.4 The solar plants on the same feeder.
3.6 The Solar Power Developer power developer shall be responsible to operate the Project as envisaged under per this Agreement & and to provide appropriate facility/ instrumentation/facility or instrumentation or metering arrangement as per Clause 4.1.
3.7 3.5 The Solar Power Developer solar power developer shall deploy components/use components or equipment for the SPV complying with approved/approved or minimum technical standards as per the International Electro Electro-technical Commission (“IEC”) & or Bureau of Indian Standards (“BIS”) or technical standards that are as specified prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developersolar power developer.
Appears in 2 contracts
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.,
3.2 APTRANSCO TRANSCO and DISCOM may also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned estimate at its discretion duly collecting the supervision charges as per procedure in vogue.
3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO TRANSCO and DISCOM authorities. If APTRANSCOTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCOTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO TRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/metering arrangement as per Clause 4.1.
3.7 The Solar Power Developer shall deploy components/equipment for the STP/SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCOTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO TRANSCO and DISCOM may also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned estimate at its discretion duly collecting the supervision charges as per procedure in vogue.
3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO TRANSCO and DISCOM authorities. If APTRANSCOTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCOTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO TRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/metering arrangement as per Clause 4.1.
3.7 The Solar Power Developer shall deploy components/equipment for the STP/SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCOTSTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO TSTRANSCO and DISCOM may also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned estimate at its discretion duly collecting the supervision charges as per procedure in vogue.
3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station Interconnection Substation from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authorities. If APTRANSCOTSTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCOTSTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO TSTRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/metering arrangement as per Clause 4.1.
3.7 The Solar Power Developer shall deploy components/equipment for the SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and DISCOM may also permit the Solar Power Developer to execute the estimate for arranging Interconnection Facilities for power evacuation as per at the sanctioned estimate Voltage of Interconnection. The Solar Power Developer shall also be responsible for obtaining any permits/ consents required for interconnection at a sub-station and will be solely responsible for liaising at its discretion duly collecting own cost with any government body/ department for obtaining such a consent/ permit The interconnection line from Project switchyard to the location has to be constructed and maintained by the SPD at his cost. The entire cost of transmission including cost of procurement of land for bay (if any), construction of lines, metering equipment, losses, supervision charges as per procedure in vogueetc.
3.3 , from the Project up to the Interconnection Point shall be borne by the SPD and shall not be reimbursed. The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO and DISCOM authorities. If APTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/instrumentation/ metering arrangement as per Clause 4.1.
3.7 . The Solar Power Developer shall deploy components/equipment for the STP/SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/DISCOM will prepare an estimate for arranging Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and DISCOM may also permit the Solar Power Developer to execute the estimate for arranging Interconnection Facilities for power evacuation as per at the sanctioned estimate Voltage of Delivery.
3.2 The Solar Power Developer shall also be responsible for obtaining any permits/ consents required for interconnection at a sub-station and will be solely responsible for liaising at its discretion duly collecting own cost with any government body/ department for obtaining such a consent/ permit
3.3 The interconnection line from Project switchyard to the location has to be constructed and maintained by the SPD at his cost. The entire cost of transmission including cost of procurement of land for bay (if any), construction of lines, metering equipment, losses, supervision charges as per procedure in vogueetc., from the Project up to the Interconnection Point shall be borne by the SPD and shall not be reimbursed.
3.3 3.4 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall have to be borne by the Solar Power Developer. The maintenance work at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO and DISCOM authorities. If APTRANSCO/DISCOM carryout the O&M work, the power producer shall pay such expenses to APTRANSCO/DISCOM as applicable.
3.4 Any modifications or procedures or changes in arranging Interconnection Facilities for power evacuations rest with APTRANSCO and DISCOM.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 The Solar Power Developer shall be responsible to operate the Project as envisaged under this Agreement & to provide appropriate facility/ instrumentation/instrumentation/ metering arrangement as per Clause 4.1.
3.7 3.6 The Solar Power Developer shall deploy components/equipment for the STP/SPV complying with approved/minimum technical standards as per International Electro technical Commission (“IEC”) & Bureau of Indian Standards (“BIS”) or technical standards that are as specified by Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/TSTRANSCO or DISCOM will shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may also permit allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned approved estimate at its discretion duly collecting the supervision charges as per the procedure in vogue.
3.3 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure shall have to be borne by the Solar Power Developerexpenditure. The maintenance work of the connected bay together with equipment at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authoritiespersonnel. If APTRANSCO/Where TSTRANSCO or DISCOM carryout carries out the O&M Maintenance work, the power producer shall pay such the expenses to APTRANSCO/TSTRANSCO or DISCOM as applicable.
3.4 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with APTRANSCO and DISCOMTSTRANSCO or DISCOM as the case may be.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 3.4 The Solar Power Developer shall be responsible to operate the Project as envisaged under per this Agreement & and to provide appropriate facility/ instrumentation/facility or instrumentation or metering arrangement as per Clause 4.1.
3.7 3.5 The Solar Power Developer shall deploy components/use components or equipment for the SPV complying with approved/approved or minimum technical standards as per the International Electro Electro-technical Commission (“IEC”) & or Bureau of Indian Standards (“BIS”) or technical standards that are as specified prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
3.6 <Intentionally left blank> <Intentionally left blank>.
3.7 Verification by TSTRANSCO/DISCOM
3.7.1 The Solar Power Developer shall allow entry to the site of the Project free of all encumbrances at all times during the Term of the Agreement to the personnel of TSTRANSCO or DISCOM for inspection and verification of the works being carried out by the Solar Power Developer at the site of the Project.
3.7.2 The TSTRANSCO or DISCOM or its representative may verify the construction works or operation of the Project being carried out by the Solar Power Developer and if it is found that the construction works or operation of the Project is not as per the Prudent Utility Practices, it may seek clarifications from the Solar Power Developer or require the works to be stopped or to comply with their instructions.
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, APTRANSCO/TSTRANSCO or DISCOM will shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may also permit allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the sanctioned approved estimate at its discretion duly collecting the supervision charges as per the procedure in vogue.
3.3 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure shall have to be borne by the Solar Power Developerexpenditure. The maintenance work of the connected bay together with equipment at the grid sub-station and connected bay and equipment has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authoritiespersonnel. If APTRANSCO/Where TSTRANSCO or DISCOM carryout carries out the O&M Maintenance work, the power producer shall pay such the expenses to APTRANSCO/TSTRANSCO or DISCOM as applicable.
3.4 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with APTRANSCO and DISCOMTSTRANSCO or DISCOM as the case may be.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder.
3.6 3.4 The Solar Power Developer shall be responsible to operate the Project as envisaged under per this Agreement & and to provide appropriate facility/ instrumentation/facility or instrumentation or metering arrangement as per Clause 4.1.
3.7 3.5 The Solar Power Developer shall deploy components/use components or equipment for the SPV complying with approved/approved or minimum technical standards as per the International Electro Electro-technical Commission (“IEC”) & or Bureau of Indian Standards (“BIS”) or technical standards that are as specified prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the Solar Power Developer.
3.6 <Intentionally left blank>
Appears in 1 contract
Sources: Power Purchase Agreement
INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developersolar power developer, APTRANSCO/TSTRANSCO or DISCOM will shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The Solar Power Developer solar power developer has to bear the entire cost of the Interconnection Facilities as per the sanctioned estimate.
3.2 APTRANSCO and approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may also permit allow the Solar Power Developer solar power developer to execute the Interconnection Facilities for power evacuation as per the sanctioned approved estimate at its discretion duly collecting the supervision charges as per the procedure in vogue. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCO.
3.3 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure shall have to be borne by the Solar Power Developerexpenditure. The maintenance work of the connected bay together with equipment at the grid sub-station and connected bay and equipment interconnection substation has to be done in coordination with the APTRANSCO TSTRANSCO and DISCOM authoritiespersonnel. If APTRANSCO/Where TSTRANSCO or DISCOM carryout carries out the O&M maintenance work, the solar power producer developer shall pay such the expenses to APTRANSCO/TSTRANSCO or DISCOM as applicable.. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,
3.4 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with APTRANSCO and DISCOMTSTRANSCO or DISCOM as the case may be.
3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/3.4 The solar plants on the same feeder.
3.6 The Solar Power Developer power developer shall be responsible to operate the Project as envisaged under per this Agreement & and to provide appropriate facility/ instrumentation/facility or instrumentation or metering arrangement as per Clause 4.1.
3.7 3.5 The Solar Power Developer solar power developer shall deploy components/use components or equipment for the SPV complying with approved/approved or minimum technical standards as per the International Electro Electro-technical Commission (“IEC”) & or Bureau of Indian Standards (“BIS”) or technical standards that are as specified prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developer.
3.6 Intentionally left blank Acceptance or Performance Test
3.7 Verification by TSTRANSCO / DISCOM
3.7.1 The solar power developer shall allow entry to the site of the Project free of all encumbrances at all times during the term of the agreement to the personnel of TSTRANSCO or DISCOM for inspection and verification of the works being carried out by the solar power developer at the site of the Project.
3.7.2 The TSTRANSCO or DISCOM or its representative may verify the construction works or operation of the Project being carried out by the solar power developer and if it is found that the construction works or operation of the Project is not as per the Prudent Utility Practices, it may seek clarifications from the Solar Power DeveloperDeveloper or require the works to be stopped or to comply with their instructions.