Common use of Interconnection System Impact Study Agreement Clause in Contracts

Interconnection System Impact Study Agreement. The form of agreement contained in Attachment 7 of the Standard Small Generator Interconnection Procedures for conducting the Interconnection System Impact Study. Network Capability Interconnection Standard (“NC Interconnection Standard”)– The minimum criteria required to permit the Interconnection Customer to interconnect a Generating Facility seeking Network Resource Interconnection Service or Elective Transmission Upgrade seeking Network Import Interconnection Service in a manner that avoids any significant adverse effect on the reliability, stability, and operability of the New England Transmission System, including protecting against the degradation of transfer capability for interfaces affected by the Generating Facility seeking Network Resource Interconnection Service or Elective Transmission Upgrade seeking Network Import Interconnection Service, as detailed in the ISO New England Planning Procedures. Network Resource (“NR”) – The portion of a Generating Facility that is interconnected to the Administered Transmission System under the Network Capability Interconnection Standard. Network Resource Capability (“NR Capability”) – The maximum gross and net megawatt electrical output of the Generating Facility at the Point of Interconnection at an ambient temperature at or above 50 degrees F for Summer and at or above 0 degrees F for Winter. Where the Generating Facility includes

Appears in 2 contracts

Sources: Service Agreement, Service Agreement