INTERFACE POINTS. The steam tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Minimum Steam: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11
Appears in 4 contracts
Sources: Coke Sale and Feed Water Processing Agreement (SunCoke Energy, Inc.), Coke Sale and Feed Water Processing Agreement (SunCoke Energy, Inc.), Coke Sale and Feed Water Processing Agreement (SunCoke Energy, Inc.)
INTERFACE POINTS. The steam tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** *) • Minimum Steam: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11Schedule 1.11 Boiler Feedwater Interface
Appears in 1 contract
INTERFACE POINTS. The steam tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** *) • Minimum Steam: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11.
Appears in 1 contract
Sources: Coke Sale and Feed Water Processing Agreement (SunCoke Energy, Inc.)