Issued for Construction (IFC) Documents. The A/E shall prepare 100% complete Construction Documents (“Issued for Construction” or “IFC Set”). The IFC Set shall represent the further progression of the approved Permit Set together with any value engineering strategies approved by the Department. The IFC Set shall be progressed to One Hundred Percent (100%) completion of those required in a traditional Design/Bid/Build delivery method. The Construction Documents shall be coordinated and shall contain at a minimum the level of detail typically required by standard industry best practices for Construction Documents. The A/E shall respond to and revise the Construction Documents as may be necessary in order to address any concerns raised by the code official.
Appears in 3 contracts
Sources: Architectural/Engineering Services Agreement, Architectural/Engineering Services Agreement, Architectural/Engineering Services Agreement