Joint Petroleum Development Area Sample Clauses

POPULAR SAMPLE Copied 1 times
Joint Petroleum Development Area. Corporate represents a reconciliation of reportable segment revenues, profit or loss, assets and liabilities to the consolidated figure. Financing requirements, finance income and expenses are managed at a Group level. Other items include non-segmental revenue, expenses and associated assets and liabilities not allocated to operating segments, mostly comprising corporate assets and expenses. It also includes expenses incurred by non-operating segments, such as new ventures and those undergoing relinquishment. The Group’s most significant customer, Indian Oil Corporation Limited, in its capacity as nominee of the Government of India, represents 100% of the Group’s total revenues (2013:100%). JPDA (1) Indonesia Corporate (2) Consolidated 2013 2014 2013 2014 2013 2014 2013 $ $ $ $ $ $ $ - - - - - 250,620 195,925 - - - - - (421,741) (489,608) - - - - - 6,534 (3,338) - - - - - (415,207) (492,946) - - - - - (164,587) (297,021) (71,775) 291,609 (31,552) (638) 53,738 (1,718,674) (1,396,597) (740,149) - - - - - (4,590,149) (40) - - (58,447) (79,421) (85,179) (111,383) - - - (383,153) (361,920) (399,112) (366,236) - - - 695,032 (2,051) 695,032 1,196 (1,003) (22,401) (15,919) (2,794,676) (2,431,021) (2,880,736) (2,502,826) (812,967) 269,208 (47,471) (2,541,882) (2,820,675) (4,553,256) (9,263,016) 67,677 84,559 732,968 68,000 - - (3,752,611) (9,110,457) 382,598 - - 9,003,317 3,075,599 39,577,622 30,132,715 237,776 157,996 204,812 832,490 1,384,280 6,223,380 5,869,326 386,302 - - - - 4,521,508 350,823 - - - 223,434 151,758 26,656,278 22,832,804 - - - 50,573 56,002 64,480 59,592 NOTE 6 – REVENUE AND EXPENSES Loss from ordinary activities before income tax has been determined after the following revenues and expenses: Note 2014 $ 2013 $
Joint Petroleum Development Area. (a) The Joint Petroleum Development Area (JPDA) is established. It is the area in the Timor Sea contained within the lines described in Annex A. (b) East Timor and Australia shall jointly control, manage and facilitate the exploration, development and exploitation of the petroleum resources of the JPDA for the benefit of the peoples of East Timor and Australia. (c) Petroleum activities conducted in the JPDA shall be carried out pursuant to a contract between the Designated Authority and a limited liability corporation or entity with limited liability specifically established for the sole purpose of the contract. This provision shall also apply to the successors or assignees of such corporations. (d) East Timor and Australia shall make it an offence for any person to conduct petroleum activities in the JPDA otherwise than in accordance with this Treaty.
Joint Petroleum Development Area. If the Contract relates to, or Services are to be performed in, the Joint Petroleum Development Area (JPDA), this Article 24 shall apply to the Contract.

Related to Joint Petroleum Development Area

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in ▇▇▇▇▇, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • PROJECT WORK PLAN The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from DFPS and the Grantee.

  • Program Development NWESD agrees that priority in the development of new applications services by WSIPC shall be in accordance with the expressed direction of the WSIPC Board of Directors operating under their bylaws.