LAN/WAN/Structured Cabling WORKS Sample Clauses

LAN/WAN/Structured Cabling WORKS. All work shall conform to the Building Code, and all local codes and ordinances as applicable. Any exceptions to the above must have written authorization from DST/▇▇▇/GoG. As mentioned above entire work has to be completed in turnkey/EPC manner. Further, below mentioned are the minimum tasks which Bidder will have to carry out during the work: (a) To carry out the feasibility study for the deployment of required LAN. (b) Bidder shall act as single Bidder to organize and manage the entire project including design, supply, installation and commissioning. The Bidder shall be in a position to test, demonstrate and certify the LAN connectivity in accordance with the contract. (c) The Bidder shall carry out site survey and prepare tentative BoM for the work to be carried out at that particular site. This BoM will have to be submitted to DST/GIL/GoG for approval along with a layout diagram indicating the location of equipment to be installed. (d) The Bidder will be responsible to undertake and complete the works related to supply installation and commissioning services across the Gujarat state. (e) In case of repairing or upgradation of existing links bidder will be responsible for removal of existing old/faulty cables or material without any additional cost to the purchaser. (f) The Bidder shall be using 4” GI Pipe as standard while installation of cabling work. (g) The Bidder shall be responsible to share the status report of existing infrastructure (i.e. Cable, network equipments, patch cord, OFC etc.), during resolving complaints. (h) The Bidder shall provide one copy of the Network Diagram, warranty documents, manuals and FAT/UAT reports etc. to concern local GOG/GSWAN authorities and another copy to DST/▇▇▇ for further process of completion of orders. (i) The Bidder will be responsible to provide the services at all the locations at the agreed price. Bidder is required to Supply and Install LAN components and commission LAN as per the requirements. The structured cabling works are to be completed on turnkey basis including installation of all required casing, conduits, flexi pipes, I/O boxes, Face Plates, removal of existing Lan infra if any, etc. To ensure quality of work done, no cable should be left bare or visibly exposed and the supplied equipments are required to be maintained for Three years from the date of FAT. (j) The Bidder shall be responsible for implementation of the work as defined. Delivered Solution must be tested and commissioned as per d...

Related to LAN/WAN/Structured Cabling WORKS

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Trunk Group Architecture and Traffic Routing 5.2.1 The Parties shall jointly establish Access Toll Connecting Trunks between CLEC and CBT by which they will jointly provide Tandem-transported Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic from and to CLEC's Customers. 5.2.2 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access and non-translated Toll Free traffic (e.g., 800/888) to allow CLEC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier that is connected to the CBT access Tandem. 5.2.3 The Access Toll Connecting Trunks shall be one-way or two-way trunks, as mutually agreed, connecting an End Office Switch that CLEC utilizes to provide Telephone Exchange Service and Switched Exchange Access Service in the given LATA to an access Tandem Switch CBT utilizes to provide Exchange Access in the LATA.

  • Year 2000 Compatibility Take all actions necessary to assure the Borrower's computer based systems are able to operate and effectively process data on and after January 1, 2000. At the request of the Lender, the Borrower shall provide the Lender with assurance acceptable to the Lender that Borrower's computer systems have Year 2000 compatibility.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.