List of Deliverables Clause Samples

POPULAR SAMPLE Copied 1 times
List of Deliverables. The Deliverables shall be remitted to ONHYM in the following formats:
List of Deliverables. The following deliverables will be prepared by the PM and submitted to the County as part of the Project:
List of Deliverables. The Contractor shall provide VCU ▇▇▇▇ ▇▇▇▇▇ Programs with: a. Daily fax confirmations of each individual transport request b. Daily confirmation fax listing all requested transport of previous day or confirmed transport scheduled for that day c. Weekly Invoicing
List of Deliverables. The following deliverables will be prepared by the PM and submitted to the County as part of the Project: • Scope of Services for each Project. The Content and format will be approved by the County Engineer. • Project Schedule updated monthly • Monthly Progress Report template for engineering consultants. • Web base project monthly report. • Preliminary Engineering Report format and guidelines. • Deliver Complete Project including Design, ROW, Environmental Permits, Utilities Cleared and approval of other agencies (TxDOT, City, MUD, LID, Etc. ) Principal Hour $283.00 Sr. Project Manager Hour $258.00 Project Manager Hour $200.00 Structural Engineer Hour $200.00 Construction Manager Hour $200.00 Sr. Project Engineer Hour $168.00 Project Engineer Hour $143.00 Field Engineer Hour $155.00 Electrical & Instrumentation Engineer Hour $168.00 Engineer Technician Hour $140.00 EIT II Hour $129.00 Graduate Engineer/EIT I Hour $113.00 Structural Inspector Hour $129.00 Construction Observer/Sr. Inspector III Hour $129.00 Construction Observer/Inspector II Hour $119.00 Construction Observer/Inspector I Hour $98.00 Sr. Designator Hour $108.00 Designator Hour $93.00 Sr. Utility Coordinator Hour $156.00 Utility Coordinator Hour $136.00 Production Manager Hour $211.00 Production Technician Hour $87.00 Sr. Electrical Designer Hour $147.00 Sr. CADD/Designer Hour $139.00 CADD/Designer Hour $126.00 CADD Technician Hour $103.00 Sr. Clerical/Administrator/Document Specialist/Recordkeeper Hour $88.00 Clerical/Administrator Hour $82.00 3D Modeling Day $850.00
List of Deliverables. Sorted by date
List of Deliverables. The development deliverables are as follows. If new deliverables are added, separate negotiations shall be carried out. Depending on the deliverables, they shall be submitted in a format approved by EF (PDF format or WORD format or EXCEL or PPT format); all 3D design data shall be delivered by UAE in CATIA P3 V5-6R2018 format (burned disk or FTP); EF shall carry out the evaluation and acceptance work and give the acceptance conclusion within 5 working days from the date of receipt of deliverables formally submitted by UAE in accordance with the nodes.
List of Deliverables. Error in the list of deliverables of WP9 corrected (only 4 deliverables in WP9 as detailed in section 3.1.3 Deliverables list). - The budget items associated to services to be contracted initially allocated under “Subcontracting” category has been moved to Contracting (Other Direct Costs). Budget tables changed accordingly. - Section on Subcontracting have been moved to section 4.2.1 and reformulated accordingly. - ARPAL budget breakdown updated to take into account that, as public body, they are funded at 100% - DGPCE budget breakdown updated to take into account that, as public body, they are funded at 100% - Elimination of the original Best Innovative Idea Prize and competition to avoid the “grant cascading” artefact, following the request of the EC. Reformulation of Task 7.4, and section 1.3.5.2 (Selection of the most innovative external idea to complement de Platform), as well as of the M7.2: Selection of the most innovative external idea to improve the platform (changes are done in description of WP7 Section 3.2.3 List of Milestones) - Included a point on Responses to the Ethics Screening requirements (5.3). - Included a point on Response to the Security Scrutiny-Evaluation Report recommendation (6.1) and added a point defining the Project Security Committee (6.2). - As result of the Security Scrutiny-Evaluation Report recommendation, D5.3 and D6.4 are changed to a two-stage publication policy and the Public deliverable is delayed of a month. Tasks associated to these two deliverables have been also extended of one month (changes are done in description of WP5 and WP6, Section 3.1.1 ▇▇▇▇▇ Chart and Section 3.1.3 List of Deliverables).
List of Deliverables. No Title W P Lead Typ e Date Status Comment 3 Standard management report Q3 1 CSC R M15 Accepted 7 Standard progress report P3 1 CSC R M18 Accepted 20 Running prototypes in cooperation with WP3 2 EDUFI P M12- M18 Accepted 21 Feedback and specifications to user scenarios 2 EDUFI P M6-M18 Accepted 24 Open source code for all components, including example code 3 EDUFI R M7-M18 Accepted EUPL v1.1. is an adequate licence for the project code. Please add this licence to the GitHub repository too. 25 Technical documentation, including glossary, model and architecture 3 EDUFI R M18 Accepted 26 Three prototypes 3 EDUFI P M10- M21 Accepted Ensure release notes and bugs are accessed publicly Resubmitted deliverables requested in previous reporting period: No Title WP Lead Type Date Status Comment D8 Project Roadmap 1 CSC R M1-M24 Accepted D14 Risk Management Plan 1 CSC R M3 Accepted D15 Desk research 2 EDUFI R M3 Accepted D18 Detailed description of the user scenarios with guidelines and advice for developers in WP3 2 EDUFI R M6 Accepted D35 Stakeholder Management plan 5 DUO R M3 Accepted Project acronym: CompLeap Project title: Open Knowledge Technologies: Mapping and validating knowledge "Learner-centred digital ecosystem of competence development (CompLeap)" Grant agreement number: SI2.488704 (ECOKT2016-1) Funding scheme: Directorate-General for Communications Networks, Content and Technology Directorate Data – Interactive Technologies, Digital for Culture and Education (unit G.2) Project starting date: 01/12/2017 Project duration: 24 months Project Manager: ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Project web site: ▇▇▇.▇▇▇▇▇▇▇▇.▇▇
List of Deliverables. Computer code development must conform to MD 11.7 and NEURG/BR-0167 requirements for Software Quality Assurance.
List of Deliverables. To be further defined on individual RFTAs. RESL will comply with NRC requirements for Sample Receipt, Sample Handling and Storage, Quality Assurance and Quality Control. All actinide samples will undergo molten salt fusions and the oxidation states of the analytes in interest will be adjusted to allow complete exchange of the isotopic tracer. Samples submitted for analysis by gamma spectrometry will be put into standard geometries and analyzed directly unless there is a reason to do something different, i.e. sieve, crush, homogenize, etc. All Analytical Results will be reported with a Total Propagated Uncertainty of 1 sigma. Depending on the sample, nuclides that may not form refractory or intractable compounds may not undergo the front end chemistry requiring total dissolution by molten salt fusions. If a sample does not require total dissolution front end chemistry then it will be discussed when the project specific requirements are discussed and before the analysis is performed. The project specific requirements for measurement sensitivity will have to be agreed upon before sample analysis as it is dependent on the instrument count times and sample size. RESL will adjust instrument counting time and sample size accordingly and only within reason. RESL will not report a minimal detectable concentration after a sample is analyzed. The total propagated uncertainty will be reported with every result and will be reported at one sigma. The interpretation of the result is that small negative and other results less or equal to two sigma are ‘zero’ or as not detected. For results greater than two sigma but less than or equal to three sigma, detection is questionable. Results greater than three sigma indicate detection. RESL will analyze up to 75 samples by Gamma Spectrometry per year at a cost of $150 1. Each analysis performed for a miscellaneous sample submitted will count as a sample. Samples will be classified as Gamma, Alpha, Beta or Gross. Thus if a sample is submitted with the request for Gamma, Sr-90 and Am-241, then one Gamma sample will be counted and two miscellaneous samples will be counted. Miscellaneous samples nuclides analyzed include: ▇▇-▇▇▇, ▇▇-▇▇▇, ▇▇-▇▇▇, ▇▇-▇▇▇, ▇▇-▇▇▇/▇▇▇, ▇-▇▇▇,▇-▇▇▇, U-238, ▇▇-▇▇▇, ▇▇-▇▇▇,▇▇-▇▇▇, ▇▇-▇▇▇, ▇-▇, ▇▇-▇▇, ▇▇-▇▇/▇▇, Tc-99, Sr-89/90, and GAB. Certain groups of nuclides will be counted as a single sample, i.e Pu-238 and Pu-239/240 is a single sample, U-238 and U-234 is a single sample, ▇▇-▇▇▇, ▇▇-▇▇▇ and Th-232 is...