LNG Operational Heel Sample Clauses

The LNG Operational Heel clause defines the minimum quantity of liquefied natural gas (LNG) that must remain in a vessel's tanks after cargo discharge to ensure safe and efficient operations. This residual amount is not available for sale or delivery and is necessary to maintain tank pressure, temperature, and the vessel’s ability to continue functioning properly. By specifying the operational heel, the clause ensures the vessel’s systems remain operational and prevents damage or safety risks associated with fully emptying the tanks.
LNG Operational Heel. (a) During normal operations, Terminal Operator will need to maintain the LNG Operational Heel. Should the LNG storage level fall below or be expected to fall below the LNG Operational Heel arising from but not limited to one or more of the following: (i) Retainage including losses in terminal operations, (ii) a Failed LNG Cargo, (iii) requirements of terminal maintenance, (iv) and any other operational needs that require use of LNG, then the Terminal Operator shall have the right to (A) purchase an LNG Cargo for the purposes of maintaining the LNG Operational Heel in the Terminal, for and on behalf of all Users, and (B) recover the costs of such purchase as operational costs under the Terminal Access Code. Such costs shall be apportioned pro rata between all Users of the Terminal at the time such costs are accrued and shall be invoiced by Terminal Operator to Terminal User in accordance with clause 12, except for cases of a Failed LNG Cargo, where the costs will be recovered by the Defaulting User, as described in the IUA. (b) If, acting as a Reasonable and Prudent Operator, Terminal Operator identifies a need to replenish the LNG Operational Heel, then Terminal Operator shall have the right to replenish the LNG Operational Heel using, at its discretion, LNG from any LNG Cargo unloaded at the Terminal, by any User.

Related to LNG Operational Heel

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and KDL, KDL, at its own expense, shall: 2.4.1.1 provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA; and/or 2.4.1.2 obtain transport to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA (a) from a third party, or, (b) if Verizon offers such transport pursuant to this Agreement or an applicable Verizon Tariff, from Verizon. 2.4.2 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and KDL, Verizon, at its own expense, shall provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA. 2.4.3 Prior to establishing any Two-Way Interconnection Trunks, KDL shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Seconds (Hundred Call Seconds) information, and the Parties shall mutually agree on the appropriate initial number of End Office and Tandem Two-Way Interconnection Trunks and the interface specifications at the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA at which the Parties interconnect for the exchange of traffic. Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One- Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.4 On a semi-annual basis, KDL shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that KDL anticipates Verizon will need to provide during the ensuing two (2) year period for the exchange of traffic between KDL and Verizon. KDL’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Seconds (Hundred Call Seconds) equal to five (5). Either Party may disconnect End Office Two-Way Interconnection Trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of ▇▇▇▇-▇▇▇▇▇▇▇▇▇ B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of ▇▇▇▇-▇▇▇▇▇▇▇▇▇ B.01 during the average time consistent busy hour. Verizon and KDL shall engineer Two-Way Interconnection Trunks using Telcordia Notes on the Networks SR 2275 (formerly known as BOC Notes on the LEC Networks SR-TSV-002275). 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • Problem Solving Employees and supervisors are encouraged to attempt to resolve on an informal basis, at the earliest opportunity, a problem that could lead to a grievance. If the matter is not resolved by informal discussion, or a problem-solving meeting does not occur, it may be settled in accordance with the grievance procedure. Unless mutually agreed between the Employer and the Union problem-solving discussions shall not extend the deadlines for filing a grievance. The Union ▇▇▇▇▇▇▇ or in their absence, the Local Union President, or Area ▇▇▇▇▇▇▇, or Chief ▇▇▇▇▇▇▇, either with the employee or alone, shall present to the appropriate supervisor a written request for a meeting. If the supervisor agrees to a problem- solving meeting, this meeting shall be held within fourteen (14) calendar days of receipt of the request. The supervisor, employee, Union ▇▇▇▇▇▇▇, and up to one (1) other management person shall attempt to resolve the problem through direct and forthright communication. If another member of management is present that person will not be hearing the grievance at Step Two, should it progress to that Step. The employee, the Union ▇▇▇▇▇▇▇ or in their absence, the Local Union President, or Area ▇▇▇▇▇▇▇, or Chief ▇▇▇▇▇▇▇, may participate in problem-solving activities on paid time, in accordance with Article 31, Union Rights, Section 1H.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.