Load Restoration Clause Samples

The Load Restoration clause outlines the procedures and responsibilities for restoring electrical load after an outage or interruption. Typically, it specifies the sequence in which power will be restored, the parties involved in the restoration process, and any prioritization of critical facilities or customers. This clause ensures a clear and coordinated approach to resuming normal operations, minimizing downtime, and addressing the needs of essential services during power recovery.
Load Restoration. The responsibilities of the Parties for restoring Load following a system disturbance are stated in Section 7.7.11.3 of the CAISO Tariff, the CAISO Operating Procedures, the CAISO Specifications and in Schedule 10.
Load Restoration. The responsibilities of the Parties for restoring Load following a system disturbance are stated in Section 4.4.4 of the ISO Tariff, the ISO Operating Procedure, the ISO Specifications and in Schedule 10.
Load Restoration. Load shed in accordance with Section 7.4.1, 7.4.2 and
Load Restoration. The Parties shall, in conformance with Applicable Requirements and their obligations to the Balancing Authority, coordinate the restoration of load following a system disturbance, and agree to do so in coordination with the Balancing Authority when required.
Load Restoration. Load shed in accordance with Section 7.4.1, 7.4.2 and 7.4.3 of this Agreement shall be restored pursuant to Schedule 12.

Related to Load Restoration

  • Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.

  • Operating Environment Per specifications given in Ref. [1]

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Restoration The Restoration Fund shall be disbursed by the Trustee in accordance with the following conditions: (a) If the cost of Restoration will exceed the Threshold Amount, prior to commencement of the Restoration the architects, general contractor(s), and plans and specifications for the Restoration shall be approved by Landlord, which approval shall not be unreasonably withheld or delayed, and which approval shall be granted to the extent that the plans and specifications depict a Restoration which is substantially similar to the Improvements and Equipment which existed prior to the occurrence of the casualty or Taking, whichever is applicable. Landlord will not withhold its consent for variations to the Improvements required as a result of current zoning and building code requirements. (b) At the time of any disbursement, no Event of Default shall exist and no mechanics’ or materialmen’s Liens shall have been filed and remain undischarged or unbonded or for which Tenant shall fail to provide affirmative title insurance coverage. (c) Disbursements shall be made from time to time in an amount not exceeding the hard and soft cost of the work and costs incurred since the last disbursement upon receipt of (1) satisfactory evidence, including architects’ certificates of the stage of completion, of the estimated cost of completion and of performance of the work to date in a good and workmanlike manner in accordance with the contracts and the plans and specifications, (2) partial releases of Liens or conditional Lien waivers, and (3) other reasonable evidence of cost and payment so that Landlord can verify that the amounts disbursed from time to time are represented by work that is completed in place or delivered to the site and free and clear of mechanics’ Lien claims. (d) Each request for disbursement shall be sent by Tenant to Landlord and to the Trustee, accompanied by a certificate of Tenant describing the work, materials or other costs or expenses, for which payment is requested and stating (i) the cost incurred in connection therewith, (ii) that no Event of Default exists and no mechanics’ or materialmen’s Liens shall have been filed and remain undischarged or unbonded, and (iii) that Tenant has not previously received payment for such work or expense; the certificate to be delivered by Tenant upon completion of the work shall, in addition, state that the work that is the subject of the request for disbursement has been substantially completed and complies with the applicable requirements of this Lease. The Trustee shall not release funds from the Restoration Fund unless and until it has received a written authorization from Landlord approving such release, which ▇▇▇▇▇▇▇▇ agrees to promptly give if ▇▇▇▇▇▇ has satisfied all of the requirements set forth in this Paragraph 15 in connection with such release. (e) The Trustee shall retain a commercially reasonable retainage amount (but in no event less than 5% of the expected repair cost, other than general conditions, until the Restoration is 50% complete). (f) The Restoration Fund shall be held by the Trustee and shall be invested as directed by Landlord. All interest shall become a part of the Restoration Fund. (g) At all times the undisbursed balance of the Restoration Fund held by the Trustee, plus any funds contributed thereto by ▇▇▇▇▇▇, at its option, shall be not less than the cost of completing the Restoration (as reasonably estimated by ▇▇▇▇▇▇, provided that Tenant shall provide to Landlord the basis for such estimate, in reasonable detail, promptly after Landlord’s request therefor), free and clear of all Liens. (h) In addition, prior to commencement of Restoration and at any time during Restoration, if the estimated cost of Restoration, as reasonably determined by a contractor or architect mutually selected by Landlord and Tenant, exceeds the amount of the Net Proceeds or the Net Award, as applicable, and Tenant Insurance Payment available for such Restoration, either, at Tenant’s option and determination, the amount of such excess shall be paid by Tenant to the Trustee to be added to the Restoration Fund or Tenant shall fund at its own expense the costs of such Restoration until the remaining Restoration Fund is sufficient for the completion of the Restoration. Any sum in the Restoration Fund which remains in the Restoration Fund upon the completion of Restoration with respect to a casualty shall be paid to Tenant; any portion of a Net Award remaining after completion of Restoration with respect to a Taking shall be paid to Landlord.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.