Common use of Lump Sum Liquidated Damages Clause in Contracts

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(ii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 5 contracts

Sources: Lease Agreement (Vertex Pharmaceuticals Inc / Ma), Lease Agreement (Senior Housing Properties Trust), Lease Agreement (Senior Housing Properties Trust)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plusplus either, as Landlord elects, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% ten percent (10%) in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) ), or (yiii) an amount equal to the sum of all of the Rent and other sums due under the Lease with respect to the twelve (12) months (or such lesser number month period next following the date of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Leasetermination. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 2 contracts

Sources: Lease Agreement (Xenetic Biosciences, Inc.), Lease Agreement (Xenetic Biosciences, Inc.)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an obligation after termination that is an additional, cumulative obligation after any such terminationto the obligations in the foregoing paragraphs, to pay forthwith to Landlord at Landlord’s 's election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plusplus either, as Landlord elects, (ii) the excess of the present value of all of the Rent rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s 's Reletting Expenses described above to the extent not theretofore paid to Landlord) , or (yiii) an amount equal to the sum of all of the rent and other sums due under the Lease with respect to the twelve (12) months (or such lesser number 12)-month period next following the date of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Leasetermination. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the PropertyAmerican Arbitration Association (or successor) in Boston, Massachusetts, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) 10 years experience in the leasing of 1,000,000 or more square feet of floor area of commercial buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 2 contracts

Sources: Lease Agreement (Parlex Corp), Lease (Parlex Corp)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% ten percent (10%) in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease). (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years years’ experience in the leasing of 1,000,000 or more square feet of floor area of office/laboratory buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 2 contracts

Sources: Lease Agreement (Keros Therapeutics, Inc.), Lease Agreement (Keros Therapeutics, Inc.)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plusplus either, as Landlord elects, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% ten percent (10%) in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) ), or (yiii) an amount equal to the sum of all of the Rent and other sums due under the Lease with respect to the twelve (12) months (or such lesser number month period next following the date of months as may then be termination plus the amount of rent of any kind and the remaining in the Term) unamortized cost of Base Rent any Initial Tenant Improvements accrued and Additional Rent unpaid at the rate last payable by Tenant under this Leasetime of termination or repossession. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years of experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Lease Agreement (Cyteir Therapeutics, Inc.)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(ii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)Landlord

Appears in 1 contract

Sources: Lease Agreement (Vertex Pharmaceuticals Inc / Ma)

Lump Sum Liquidated Damages. If the Term of this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages damages, a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by then due from Tenant and not then paid at the time of such election, plus, plus (ii) the excess of (x) the present value of all of the Rent reserved for the residue of the Term in the absence of such termination over (with Additional Rent deemed to increase 5% in each year on a compounding basisy) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the PropertyAmerican Arbitration Association in Boston, with a request for arbitration in accordance with the expedited commercial arbitration rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years years’ experience in the leasing of 1,000,000 or more square feet of floor area of in buildings similar in character and location to the PremisesBuilding, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties. In lieu of the damages, indemnity, and full recovery by Landlord of the sums payable under the foregoing grammatical paragraph, Landlord may, by written notice to Tenant within six (6) months after termination under any of the provisions contained herein and before such full recovery, elect to recover, and Tenant shall thereupon pay, as liquidated damages under this Section 14.3(c), an amount equal to (i) the aggregate of the Base Rent and Additional Rent for the twelve-(12)-month period ending one year after the termination date (or, if lesser, for the balance of the Term had it not been terminated), plus (ii) the amount of Base Rent and Additional Rent of any kind accrued and unpaid at the time of termination, and minus (iii) the amount of any recovery by Landlord under the foregoing provisions of this Section 14.3(c) up to the time of payment of such liquidated damages (but with the amount under this clause (iii) reduced by any amounts of reimbursement under Section 14.3(a)). The amount under clause (i) represents a reasonable forecast of the minimum damages expected to occur in the event of a breach, taking into account the uncertainty, time and cost of determining elements relevant to actual damages, such as fair market rent, time and costs that may be required to re-lease the Premises, and other factors. Liquidated damages for the loss of rent under this paragraph shall not be in lieu of any claims for reimbursement under Section 14.3(a).)

Appears in 1 contract

Sources: Lease Agreement (Cerevel Therapeutics Holdings, Inc.)

Lump Sum Liquidated Damages. If this Lease is terminated for default, unless and until Landlord elects termination damages described in the preceding paragraph, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (xi) the sum of (iA) all sums to be paid by Tenant and not then paid at the time of such election, plusplus (B) either, as Landlord elects, (iii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% seven and one-half percent (7.5%) in each year on a compounding basis) over less the present value of the aggregate fair market rent and Additional Rent potentially payable (if less than the Rent payable hereunder) by a third-party on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies (and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to LandlordLandlord pursuant to Section 14.02(a)), or (ii) or an amount equal to the sum of all of the Rent and other sums due under the Lease with respect to the eighteen (18) month period next following the date of termination plus the amount of rent of any kind and the remaining unamortized cost of (x) the Allowance, (y) twelve (12) months Base Rent that would have been payable for the period (or such lesser number of months as may then be remaining in transpired portion thereof) commencing on the Term) of Base Term Commencement Date and terminating the day prior to the Rent and Additional Rent Commencement Date, at the rate last payable of $50.00 per rentable square feet of the Premises, and (z) all fees and costs incurred by Tenant under this LeaseLandlord in connection with the Lease transaction (including, without limitation, the brokerage commission(s) and reasonable attorneys’ fees and costs), as all of items (x)-(z) shall have been amortized over the original Lease Term, together with an interest factor equal to eight percent (8%), to the extent accrued and unpaid at the time of termination or repossession. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iii)(B), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years of experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Lease Agreement (Curis Inc)

Lump Sum Liquidated Damages. If this Lease is terminated for defaultan Event of Default, Tenant covenants, as an additional, cumulative obligation in lieu of any further damages under subsection (b) above after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, plus (ii) the excess of the present value of all of the Rent reserved for the residue of the Term following such election (with Additional Rent deemed to increase 5% in each year at the average rate of such increase over the last three (3) Lease Years prior to such election (or such shorter period if three (3) Lease Years have not occurred prior to such election) on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such periodperiod (determined as of the time of termination), which fair market rent shall be reduced by set taking account of reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Lease Agreement (Synageva Biopharma Corp)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% at the CPI in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) 12 months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this LeaseLease or less if less than a full year is then left on the Term. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(ii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the Property, with a request for arbitration in accordance with the rules of the Association AAA by a single arbitrator who shall be a licensed real estate broker with at least ten (10) 10 years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Lease Agreement (Ironwood Pharmaceuticals Inc)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, plus (ii) the excess of the present value of all of the Rent rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent additional rent payable (if less than the Rent rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease). (The Federal Reserve discount rate (or equivalent) shall be used in In calculating such present values under clause (x)(iiii), and the parties shall use the “Discount Rate”, which shall be deemed to be the rate which, when compounded monthly, is equivalent to the Treasury Rate, when compounded semi-annually. The “Treasury Rate” is the semi-annual yield on the Treasury Constant Maturity Series with maturity equal to what would have otherwise been the remaining Term of this Lease for the week prior to the Discount Rate, as reported in Federal Reserve Statistical Release H.15 – Selected Interest Rates, as determined by Landlord as of the applicable date. The rate will be determined by linear interpolation between the yields reported in Release H.15, if necessary (in the event Release H.15 is no longer published, Landlord shall select a comparable publication to determine the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the partiesTreasury Rate.)

Appears in 1 contract

Sources: Lease Agreement (Digitas Inc)

Lump Sum Liquidated Damages. If the Term of this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages damages, a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, plus (ii) the excess of (x) the present value of all of the Rent reserved for the residue of the Term in the absence of such termination (with Additional Rent deemed to increase 5% in each year on a compounding basis) over (y) the present value of the aggregate fair market rent and Additional Rent (with Additional Rent deemed to increase 5% in each year on a compounding basis) payable (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord), plus (iii) or the amount of free rent provided under Section 4.1(a) of the Lease (y) twelve (12) months (or such lesser less a pro-rata portion thereof, in proportion that the number of months as may then be remaining of the Term after the Rent Commencement Date for which Tenant made payment of all Base Rent due to Landlord bears to the total number of months in the Term) Initial Term following the Rent Commencement Date in the absence of Base Rent and Additional Rent at the rate last payable by Tenant under this Leasesuch termination). (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA closest to the PropertyAmerican Arbitration Association in Boston, with a request for arbitration in accordance with the expedited commercial arbitration rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) years years’ experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Corporate Headquarters Lease (TripAdvisor, Inc.)

Lump Sum Liquidated Damages. If this Lease is terminated for default, Tenant covenants, as an additional, cumulative obligation after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plusplus either, as Landlord elects, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year on a compounding basis) over the present value of the aggregate fair market rent (including the costs and Additional expenses included in Rent payable hereunder) (if less than the Rent payable hereunder) on account of the Premises during such period, which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) ), or (yiii) an amount equal to the sum of all of the Rent and other sums due under the Lease with respect to the twelve (12) months (or such lesser number 12)-month period next following the date of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Leasetermination. (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed real estate broker with at least ten (10) 10 years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on the parties.)

Appears in 1 contract

Sources: Industrial Real Estate Lease (Alexion Pharmaceuticals Inc)

Lump Sum Liquidated Damages. If this Lease is terminated for defaultbased on an Event of Default, Tenant covenants, as an additional, cumulative obligation in lieu of any further damages under subsection (b) above after any such termination, to pay forthwith to Landlord at Landlord’s election made by written notice at any time after termination, as full and final liquidated damages a single lump sum payment equal to either (x) the sum of (i) all sums to be paid by Tenant and not then paid at the time of such election, plus, (ii) the excess of the present value of all of the Rent reserved for the residue of the Term (with Additional Rent deemed to increase 5% in each year at the average rate of such increase over the last three (3) Lease Years prior to such election (or such shorter period if three (3) Lease Years have not occurred prior to such election) on a compounding basis) over the present value of the aggregate fair market rent and Additional Rent payable (if less than the Rent payable hereunder) on account of the Premises during such periodperiod (determined as of the time of such termination), which fair market rent shall be reduced by reasonable projections of vacancies and by Landlord’s Reletting Expenses described above to the extent not theretofore paid to Landlord) or (y) twelve (12) months (or such lesser number of months as may then be remaining in the Term) of Base Rent and Additional Rent at the rate last payable by Tenant under this Lease). (The Federal Reserve discount rate (or equivalent) shall be used in calculating such present values under clause (x)(iiii), and in the event the parties are unable to agree on such fair market rent, the matter shall be submitted, upon the demand of either party, to the office of the AAA American Arbitration Association (or successor) closest to the Property, with a request for arbitration in accordance with the rules of the Association by a single arbitrator who shall be a licensed MAI appraiser, so-called, knowledgeable in the field of commercial real estate broker with at least ten (10) years experience in the leasing of 1,000,000 or more square feet of floor area of buildings similar in character and location to the Premises, and who shall not be affiliated with either Landlord or Tenant and has not worked for either party or its affiliates at any time during the prior five (5) years, whose decision shall be conclusive and binding on ’ experience in the partiesmarket in which the Building is located.)

Appears in 1 contract

Sources: Lease Agreement (Concert Pharmaceuticals, Inc.)