Major Clause Samples

A "major" clause typically defines what constitutes a significant or material event, breach, or change within the context of a contract. In practice, this clause may specify thresholds or criteria for determining when an issue or action is considered major, such as a substantial failure to perform obligations or a significant change in circumstances. Its core function is to distinguish between minor and major matters, ensuring that only serious issues trigger certain contractual rights or remedies, thereby allocating risk and clarifying the parties' expectations.
POPULAR SAMPLE Copied 1 times
Major registered students and applicants holding an Offer to study will be informed of the outcome of deliberations of major variations as soon as is practicable. Normally this is no later than the date at which the timetable is published for the upcoming term. Major variations refer to modifications of the programme and include: amendments to learning outcomes of modules and programmes; changes affecting multiple modules across the programme; removal and addition of modules from a programme; a change to the final award title; changes that impact on the recognition of the programme by accrediting bodies; changes to the credit value of a programme or module; changes that have regulatory or progression implications.
Major. A Party performing routine maintenance and inspection activities that will require major equipment or system outages shall provide the other Party with not less than seventy-two (72) hours’ prior notice, if practicable; provided that the provisions of Section 3.7.2 remain applicable to the outages and that the notice required by this Section 10.5 shall be in addition to, and does not substitute for, the requirements of Section 3.7. As noted in Article 3.7, Parties must comply with the applicable RTO requirements.
Major. Major system functions are unavailable or unusable. An agreed-upon workaround is available, and operations can continue in a restricted fashion. The problem/defect has one or more of the following characteristics: a. Reoccurring Errors causing the system to fail, but restart or recovery is possible. b. Severely degraded performance. c. Limited access to data to perform the job. d. Missing a message capture per requirements (no error message at all) when a major error occurs. e. Incorrect response to a command for a major system function. f. Security vulnerability with a workaround that mitigates such vulnerability. g. Some important functionality is unavailable, yet the system can continue to operate in a restricted fashion.
Major. The position of Major shall be filled by appointment by the Chief of Police from the rank of Captain from the Midwest City Police Department, with the process designed by the Chief to meet the needs of the department.
Major. Conditions which impair the effective functional capability, performance, or specification adherence of the product/system or total loss or reduction of functional capability of a part of the product/system for which a workaround exists. Results in moderate business impact on Customer, requiring prompt corrective action on the next business day.
Major. The defect affects major functionality or major data. It has a workaround but is not obvious and is difficult. A plan for full resolution will be provided within one (1) business day of the report.
Major. A deviation is major when it involves a departure from requirements or specifications involving: health, performance, interchangeability, reliability, survivability, maintainability or durability of the item or parts, effective use or operation of the item or system, weight or size and appearance (when a factor).
Major. Deadlines The Major Deadlines shall be amended and restated to be as set forth on Exhibit A hereto.
Major. A grievance shall be presented in writing by the aggrieved employee
Major. Licensee is able to use the Licensed Software Product but is severely restricted because specified functions are failing, resulting in impaired productivity. There is a workaround but it is awkward. Eftia will use commercially diligent efforts to have a two hour acknowledgment, one day response, and two-day resolution/work around/patch.