Meeting and Training on Owner s’ Construction Project Management Software Systems Sample Clauses

Meeting and Training on Owner s’ Construction Project Management Software Systems. The Design-Build Firm shall designate a member of the key personnel, as listed in Exhibit 5 (Design-Build Firm s’ Staffing Plan), to be solely responsible for all updates to and management of documentation in the use of Owner s’ construction project management software systems defined in Section I.A.13. This designated individual shall attend training sessions with the Owner or Program Manager, as appropriate to understand and use each software system and shall receive access to each such software system. Owner reserves the right at any time to implement updates to, or use different, construction project management software systems, in order to manage the Project, in which case the Design-Build Firm shall undergo training sessions at its own cost in the use thereof. The Design-Build Firm s’ use of CPMS shall, with respect to Projectmates, be under the license of the Program Manager, for which the Design-Build Firm shall compensate the Program Manager based on the number of user seats the Design-Build Firm desires to have, which shall be based on the Design-Build Firm s’ required number of seats (one minimum) and based on Projectmates ’current annual rates.

Related to Meeting and Training on Owner s’ Construction Project Management Software Systems

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre- Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.