Meteorological Data Reporting Requirement Clause Samples

Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only)
Meteorological Data Reporting Requirement. (Applicable to solar generation facilities only)
Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) SCHEDULE D SINGLE-LINE DIAGRAM
Meteorological Data Reporting Requirement. (Applicable to solar generation facilities only) SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE
Meteorological Data Reporting Requirement. The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including:
Meteorological Data Reporting Requirement. (Applicable to solar generation facilities only) SCHEDULE OF TERMS AND CONDITIONS FOR SURPLUS INTERCONNECTION SERVICE 4.1 Attachment Facilities Charge: $0 4.2 Network Upgrades Charge: $1,089,569 4.3 Local Upgrades Charge: $0 4.4 Other Charges: $467,270 4.5 Cost breakdown: $938,554 Direct Labor $345,690 Direct Material $204,626 Indirect Labor $67,969 Indirect Material $1,556,839 Total
Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: [SPECIFY AGREED UPON METEOROLOGICAL AND FORCED OUTAGE DATA REQUIREMENTS] [OR] [NOT APPLICABLE FOR THIS INTERIM ISA]
Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) SCHEDULE D SINGLE-LINE DIAGRAM Additional Provisions for Billings and Payments Copy of Sheet Containing Original Signatures to the Thalassa Interim ISA Redlined Pages Showing the Nonconforming Language in the Thalassa Interim ISA (1) on or before the date of such notice, and (2) after the date of such notice, if the costs could not reasonably be avoided despite, or were incurred by reason of, Interconnection Customer’s determination not to interconnect. Interconnection Customer’s liability under the preceding sentence shall include all Cancellation Costs in connection with the acquisition, design, construction and/or installation of the facilities described in section 3.0 of the Specifications. In the event the Interconnected Transmission Owner incurs Cancellation Costs, it shall provide the Transmission Provider, with a copy to the Interconnection Customer, with a written demand for payment and with reasonable documentation of such Cancellation Costs. Within 60 days after the date of Interconnection Customer’s notice, Transmission Provider shall provide an accounting of, and the appropriate party shall make any payment to the other that is necessary to resolve, any difference between (i) Interconnection Customer's cost responsibility under this Interim ISA and the Tariff for Costs, including Cancellation Costs, of the facilities described in section 3.0 of the Specifications and (ii) Interconnection Customer's previous payments under this Interim ISA. Notwithstanding the foregoing, however, Transmission Provider shall not be obligated to make any payment that the preceding sentence requires it to make unless and until the Interconnected Transmission Owner has returned to it the portion of Interconnection Customer’s previous payments that Transmission Provider must pay under that sentence. This Interim ISA shall be deemed to be terminated upon completion of all payments required under this paragraph (b).
Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) SCHEDULE D SINGLE-LINE DIAGRAM AF2-127 Point of Interconnection ▇▇▇▇▇▇▇▇ Road 138 kV Single-line Diagram (remote stations not completely shown) North South Hicksville City of ▇▇▇▇▇ M M M ITO IC Richland ITO Interconnected Transmission Owner IC Interconnection Customer Existing