Common use of Method B Clause in Contracts

Method B. Insloping the roadbed at not less than 13 mm (½ inch) per meter (yard) of width. 2. Unless otherwise approved by the Forest Service, water bars shall be installed in accordance with the drawings specified in C(T) 5.31#. 3. Continuous blade shaping of the roadbed is not required under this specification. 4. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 6 meters (20 feet) of the structure. 5. Clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional. Remove all purchaser-installed temporary drainage structures and reshape drainage to original contours. Removed structures shall become Purchaser's property to be removed from Government land.

Appears in 1 contract

Sources: Timber Sale Contract

Method B. Insloping the roadbed at not less than 13 mm (½ inch) per meter (yard) of width. 2. Unless otherwise approved by the Forest Service, water bars shall be installed in accordance with the drawings specified in C(T) 5.31C5.31#. 3. Continuous blade shaping of the roadbed is not required under this specification. 4. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 6 meters (20 feet) of the structure. 5. Clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional. Remove all purchaser-installed temporary drainage structures and reshape drainage to original contours. Removed structures shall become Purchaser's property to be removed from Government land.

Appears in 1 contract

Sources: Timber Sale Contract