Minimum Compressive Strength Sample Clauses

Minimum Compressive Strength. Concrete shall be made of materials accepted for the project, of the proportions designated by the Superintending Engineer and in accordance with the requirements hereinafter setforth. The proportions shall be based on 'laboratory tests and shall be such that they will produce durable concrete of satisfactory plasticity and workability and which will attain compressive 'strength specified below or other values that may be stipulated for a particular work using ordinary Portland cement. Mix Minimum cylinder strength requirements 28 days and 7 days optional 0.070.3Kg / cm2 (Ibs. / ▇▇.▇▇. ) Modular Ratio Preliminary Tests Work Test
Minimum Compressive Strength. Concrete shall be made of materials accepted for the project, of the proportions designated by the Superintending Engineer and in accordance with the requirements hereinafter setforth. The proportions shall be based on 'laboratory tests Mix Minimum cylinder strength requirements 28 days and 7 days optional 0.070.3Kg / cm2 (Ibs. / ▇▇.▇▇. ) Modular Ratio Preliminary Tests Work Test Days 28 Days 7 1:2:4 2700 1800 1200 15 Ordinary
Minimum Compressive Strength. Concrete shall be made of materials accepted for the project, of the proportions designated by the Superintending Engineer and in accordance

Related to Minimum Compressive Strength

  • Industry Troubleshooter Where a difference arises between the parties relating to the dismissal, discipline, or suspension of an employee, or to the interpretation, application, operation, or alleged violation of this Agreement, including any question as to whether a matter is arbitrable, during the term of the Collective Agreement, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇, or a substitute agreed to by the parties, shall at the request of either party:

  • First Aid Kits The Employer shall provide an area, equipped with a first-aid kit, for the use of Employees taken ill during working hours.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.