Mix Design Acceptance Sample Clauses

Mix Design Acceptance. The Engineer will accept or reject the shotcrete mix design based on the results of the preconstruction field trials, testing and materials used. Before approving any changes to a previously accepted mix design, the Engineer may require additional preconstruction testing at no additional cost to the agency.
Mix Design Acceptance. Delete the second and third paragraph and add the following:

Related to Mix Design Acceptance

  • Order Acceptance ▇▇▇▇▇▇▇’▇ acceptance of the Order and consequent agreement to the Contract by either: (a) delivering the Goods, Services, or Digital Services; or

  • INSPECTION, ACCEPTANCE AND REJECTION a. All shipments of Goods and performance of Services shall be subject to Buyer’s right of inspection. Buyer shall have ninety (90) days (the “Inspection Period“) following the delivery of the Goods at the Delivery Point or performance of the Services to undertake such inspection, and upon such inspection Buyer shall either accept the Goods or Services (“Acceptance“) or reject them. Buyer shall have the right to reject any Goods that are delivered in excess of the quantity ordered or are damaged or defective. In addition, Buyer shall have the right to reject any Goods or Services that are not in conformance with the Specifications or any term of this Agreement. Transfer of title to Buyer of Goods shall not constitute Buyer’s Acceptance of those Goods. Buyer shall provide Supplier within the Inspection Period notice of any Goods or Services that are rejected, together with the reasons for such rejection. If Buyer does not provide Supplier with any notice of rejection within the Inspection Period, then Buyer will be deemed to have provided Acceptance of such Goods or Services. Buyer’s inspection, testing, or Acceptance or use of the Goods or Services hereunder shall not limit or otherwise affect Supplier’s warranty obligations hereunder with respect to the Goods or Services, and such warranties shall survive inspection, test, Acceptance and use of the Goods or Services. b. Buyer shall be entitled to return rejected Goods to Supplier at Supplier’s expense and risk of loss for, at Buyer’s option, either: (i) full credit or refund of all amounts paid by Buyer to Supplier for the rejected Goods; or (ii) replacement Goods to be received within the time period specified by Buyer. Title to rejected Goods that are returned to Supplier shall transfer to Supplier upon such delivery and such Goods shall not be replaced by Supplier except upon written instructions from Buyer. Supplier shall not deliver Goods that were previously rejected on grounds of non-compliance with this Agreement, unless delivery of such Goods is approved in advance by Buyer, and is accompanied by a written disclosure of Buyer’s prior rejection(s).

  • PRODUCT ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor in the Authorized User Agreement, Authorized User(s) shall have sixty (60) days from the date of delivery to accept all Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Title or other property interest and risk of loss shall not pass from Contractor to the Authorized User until the Products have been accepted. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty

  • Card Acceptance When accepting a Card, ▇▇▇▇▇▇▇▇ will follow the steps provided by Servicer for accepting Cards and will: (a) determine in good faith and to the best of its ability that the Card is valid on its face; (b) obtain Authorization from the Card Issuer to charge the Cardholder's account; (c) unless the Sales Draft is electronically generated or is the result of a mail, internet, phone or preauthorized order, (i) obtain an Imprint of the Card including embossed data from the merchant imprinter plate; and (ii) obtain the Cardholder's signature on the Sales Draft and compare that signature to the signature on the Card; (d) enter a description of the goods or services sold and the price thereof (including any applicable taxes); (e) deliver a true and completed copy of the Sales Draft to the Cardholder at the time the goods are delivered or services performed, or, if the Sales Draft is prepared by a point-of-sale terminal, at the time of the sale; (f) offer the Sales Draft to Servicer for purchase according to Servicer's procedures and the terms of this Agreement; and (g) make a Card Imprint, if the Transaction is not based upon a mail, internet, phone or pre-authorized order.

  • Payment Does Not Imply Acceptance of Work The granting of any payment by City, or the receipt thereof by Contractor, shall in no way lessen the liability of Contractor to replace unsatisfactory work, equipment, or materials, although the unsatisfactory character of such work, equipment or materials may not have been apparent or detected at the time such payment was made. Materials, equipment, components, or workmanship that do not conform to the requirements of this Agreement may be rejected by City and in such case must be replaced by Contractor without delay.