Mixing. The materials shall, unless otherwise directed by the Engineer, be mixed in approved mechanical batch mixers. In each case, the number and capacity of mixers employed shall be sufficient for the concreting operations being undertaken, shall allow for sufficient reserve capacity at all times and shall be subject to the approval of the Engineer. The mixing shall continue until there is a uniform distribution of the materials and the mass is uniform in colour and consistency, but in no case shall the mixing be for less than 2 minutes after all the ingredients are in the mixer. Water shall be added prior to, during and following the mixer-charging operations. Overmixing requiring the addition of water to preserve the required concrete consistency will not be permitted. No dry material shall be introduced into a mixer until all material from the previous batch has been removed and the interior of the mixing drum has been cleaned of encrustations of concrete or mortar. Remixing of concrete or the addition of water to a mixture that has already begun to set or that is otherwise unsuitable for casting shall not be permitted and such concrete shall be wasted. When a concrete mixer has been out of use for more than 20 minutes, or when the type of cement is changed, the mixer shall be thoroughly cleaned before a fresh batch of concrete is made in it. The Engineer may in exceptional cases permit hand mixing of lean and other non-reinforced concrete. No hand mixing shall be done unless authorised in writing by the Engineer. The batches in hand mixing shall not exceed 1/6 of a cu.m. Hand mixed concrete shall not be used until the mixing of the whole batch has been completed and the concrete is of uniform colour and consistency. Hand mixing shall be done twice on dry aggregate, and at least twice wet, on a clean and even surface, which will prevent the loss of water during mixing. The water added shall be measured in order to prevent the use of an excessive quantity of water. When mixing by hand, the quantity of cement shall be increased by 10% above that specified above in Section 202.3.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract