Common use of Modifications/Additions to Member-Owned Renewable Generation Clause in Contracts

Modifications/Additions to Member-Owned Renewable Generation. 7.1. If the Member-owned renewable generation system is subsequently modified to increase its Gross Power Rating, the Member must notify FKEC by submitting a new application and Interconnection Agreement specifying the modification at least thirty (30) calendar days prior to making the modification. 7.2. If the Member adds another Member-owned renewable generator system which i.) Utilizes the same utility inter-active inverter, or other device certified pursuant to Section 3.1 above, for both systems; and ii.) Utilizes a separate utility inter- active inverter, or other device certified pursuant to Section 3.1 above, for each system the Member shall provide thirty (30) calendar day notice prior to installation. ▇.▇. ▇▇ the event any Member modifications or additions result in the input to any FKEC meter to qualify as a Tier 2 or Tier 3 system, then all terms and conditions, including appropriate notice, of the Interconnection Agreement for Tier 2 or Tier 3 systems shall apply. 7.4. The Interconnection Agreement which applies in instances described in Sections 7.1, 7.2, and 7.3 above shall be determined by the combined gross power rating of the generation system(s) which is connected to the FKEC meter. In all instances described in this Section 7, the Member shall submit a new application to FKEC and shall enter into a new Interconnection Agreement. In no event shall the maximum output of the Member-owned generation system(s), which is connected to the FKEC meter exceed 2 ▇▇ ▇▇▇▇▇ Power Rating.

Appears in 1 contract

Sources: Interconnection Agreement

Modifications/Additions to Member-Owned Renewable Generation. 7.1. If the Member-owned renewable generation system is subsequently modified in order to increase its Gross Power Ratingpower rating, the Member must notify FKEC by submitting a new application and Interconnection Agreement specifying the modification at least thirty (30) calendar days prior to making the modification. 7.2. If the Member adds another Member-owned renewable generator system which i.) Utilizes utilizes the same utility inter-active inverter, or other device certified pursuant to Section 3.1 above, for both systems; and or ii.) Utilizes utilizes a separate utility inter- inter-active inverter, or other device certified pursuant to Section 3.1 above, for each system the Member shall provide thirty (30) calendar day days notice prior to installation. ▇.▇7.3. ▇▇ In the event any Member modifications or additions result in the input to any FKEC meter so as to qualify as a Tier 2 or Tier 3 system2, then all terms and conditions, including appropriate notice, of the Interconnection Agreement for Tier 2 or Tier 3 systems shall apply.including 7.4. The Interconnection Agreement which applies in instances described in Sections 7.1, 7.2, 7.2 and 7.3 above shall be determined by the combined gross power rating of the generation system(s) which is connected to the FKEC meter. In all instances described in this Section 7, the Member shall submit a new application to FKEC and shall enter into a new Interconnection Agreement. In no event shall the maximum output of the Member-owned generation system(s), which is connected to the FKEC meter meter, exceed 2 ▇▇ ▇▇▇▇▇ Power RatingMW.

Appears in 1 contract

Sources: Interconnection Agreement