Monitoring, Maintenance, and Management Clause Samples

Monitoring, Maintenance, and Management. Monitoring requirements associated with implementation of SA 108 will be developed as described in Section 6.5.2. Maintenance of access routes, infrastructure, and material stockpiles developed as part of the augmentation program will be funded and implemented as part of the overall BRGMP.
Monitoring, Maintenance, and Management. ‌ Monitoring, maintenance, and management details associated with implementation of SA 104 will be developed in consultation with the USFWS, NOAA Fisheries, WDFW, and other members of the ARG, as part of ongoing consultation and annual reporting (see section 7.0). Implementation of this FCIP includes active collection, sampling, genetic analysis, and PIT-tagging of native char. Fish that are recaptured by active collection or at the fish passage facilities will be transported upstream or downstream or returned to the collection site according to established procedures and protocols. Modification of procedures and protocols allows for adaptive management in response to new information or changing conditions. The intent of the FCIP is to provide population connectivity through capturing, sampling, genetically analysis, and tagging a large proportion of native char in ▇▇▇▇ ▇▇▇▇▇▇▇ without harming Sulphur Creek origin fish. If the proportion of out-of-basin and ▇▇▇▇▇ Lake origin native char decreases in ▇▇▇▇ ▇▇▇▇▇▇▇, the need for supplemental ▇▇▇▇ ▇▇▇▇▇▇▇ active collection efforts (i.e., angling) may decrease. Any changes to the active collection efforts in ▇▇▇▇ ▇▇▇▇▇▇▇ will be considered in consultation with USFWS, NOAA Fisheries, WDFW and other ARG members and submitted to the FERC as part of the annual reporting process.
Monitoring, Maintenance, and Management. ‌ Monitoring, maintenance, and management associated with implementation of SA 101 will be identified during development of individual measures required by the Article. Monitoring details including the objectives, methods, frequency, extent, schedule, and demonstration of success will be developed in consultation with the ARG, the WDFW, the Swinomish Indian Tribal Community, the Upper Skagit Indian Tribe and Sauk- Suiattle Indian Tribe.
Monitoring, Maintenance, and Management. ‌ PSE will be responsible for initial positioning of LWD at stockpile sites. Removal of the LWD from the stockpile sites is beyond the requirements of the LWDMP. Stockpiled wood will be made available for use as directed by the ARG and TRIG. PSE will secure stockpile areas using means such as locked gates and/or fencing as appropriate if the stockpile areas are located on PSE property. PSE staff will provide access through locked gates or other restrictions as necessary, but will not assist in loading LWD onto transport vehicles or provide heavy equipment for LWD movement. PSE will maintain the stockpile areas by restacking LWD prior to restocking as necessary for safety and project efficiency. PSE staff will visually inspect the stockpile areas at least monthly unless weather conditions prevent road access. The LWD stockpile areas will be inventoried each year to record the number, size, species, and condition of LWD available for use. The stockpile inventory will be provided to the ARG, TRIG, and FERC as part of annual reporting requirements described in SA 102 Aquatics Reporting. Management activities that are required in support of the LWDMP will be funded by PSE.

Related to Monitoring, Maintenance, and Management

  • NETWORK MAINTENANCE AND MANAGEMENT 38.1 The Parties will work cooperatively to implement this Agreement. The Parties will exchange appropriate information (for example, maintenance contact numbers, network information, information required to comply with law enforcement and other security agencies of the government, escalation processes, etc.) to achieve this desired result. 38.2 Each Party will administer its network to ensure acceptable service levels to all users of its network services. Service levels are generally considered acceptable only when End Users are able to establish connections with little or no delay encountered in the network. Each Party will provide a twenty four (24)-hour contact number for Network Traffic Management issues to the other’s surveillance management center. 38.3 Each Party maintains the right to implement protective network traffic management controls, such as “cancel to”, “call gapping” or seven (7)-digit and ten (10)-digit code gaps, to selectively cancel the completion of traffic over its network, including traffic destined for the other Party’s network, when required to protect the public-switched network from congestion as a result of occurrences such as facility failures, switch congestion or failure or focused overload. Each Party shall immediately notify the other Party of any protective control action planned or executed. 38.4 Where the capability exists, originating or terminating traffic reroutes may be implemented by either Party to temporarily relieve network congestion due to facility failures or abnormal calling patterns. Reroutes shall not be used to circumvent normal trunk servicing. Expansive controls shall be used only when mutually agreed to by the Parties. 38.5 The Parties shall cooperate and share pre-planning information regarding cross-network call-ins expected to generate large or focused temporary increases in call volumes to prevent or mitigate the impact of these events on the public-switched network, including any disruption or loss of service to the other Party’s End Users. Facsimile (FAX) numbers must be exchanged by the Parties to facilitate event notifications for planned mass calling events. 38.6 Neither Party shall use any Interconnection Service provided under this Agreement or any other service related thereto or used in combination therewith in any manner that interferes with or impairs service over any facilities of AT&T-21STATE, its affiliated companies or other connecting telecommunications carriers, prevents any carrier from using its Telecommunications Service, impairs the quality or the privacy of Telecommunications Service to other carriers or to either Party’s End Users, causes hazards to either Party’s personnel or the public, damage to either Party’s or any connecting carrier’s facilities or equipment, including any malfunction of ordering or billing systems or equipment. Upon such occurrence either Party may discontinue or refuse service, but only for so long as the other Party is violating this provision. Upon any such violation, either Party shall provide the other Party notice of the violation at the earliest practicable time. 38.7 AT&T TENNESSEE hereby commits to provide Disaster Recovery to CLEC according to the plan below. 38.7.1 AT&T TENNESSEE Disaster Recovery Plan 38.7.2 In the unlikely event of a disaster occurring that affects AT&T TENNESSEE’s long-term ability to deliver traffic to a CLEC, general procedures have been developed by AT&T TENNESSEE to hasten the recovery process in accordance with the Telecommunications Service Priority (TSP) Program established by the FCC to identify and prioritize telecommunication services that support national security or emergency preparedness (NS/EP) missions. A description of the TSP Program as it may be amended from time to time is available on AT&T TENNESSEE’s Wholesale – Southeast Region Web site. Since each location is different and could be affected by an assortment of potential problems, a detailed recovery plan is impractical. However, in the process of reviewing recovery activities for specific locations, some basic procedures emerge that appear to be common in most cases. 38.7.3 These general procedures should apply to any disaster that affects the delivery of traffic for an extended time period. Each CLEC will be given the same consideration during an outage, and service will be restored as quickly as possible. AT&T TENNESSEE reserves the right to make changes to these procedures as improvements become available or as business conditions dictate. 38.7.4 This plan will cover the basic recovery procedures that would apply to every CLEC.

  • Record Maintenance and Retention A. Grantee shall keep and maintain under GAAP or GASB, as applicable, full, true, and complete records necessary to fully disclose to the System Agency, the Texas State Auditor’s Office, the United States Government, and their authorized representatives all information required to determine compliance with the terms and conditions of this Grant Agreement and all state and federal rules, regulations, and statutes. Grantee shall ensure these same requirements are included in all subcontracts. B. Grantee shall maintain and retain legible copies of this Grant Agreement and all records relating to the performance of the Grant Agreement, including supporting fiscal documents adequate to ensure that claims for grant funds are in accordance with applicable State of Texas requirements. These records shall be maintained and retained by the Grantee for a minimum of seven (7) years after the Grant Agreement expiration date or seven (7) years after all audits, claims, litigation, or disputes involving the Grant Agreement are resolved, whichever is later. Grantee shall ensure these same requirements are included in all subcontracts.

  • RECORDS MANAGEMENT AND MAINTENANCE CONTRACTOR, its officers, agents, employees and subcontractors shall, throughout the term 12 of this Agreement, prepare, maintain and manage records appropriate to the services provided and in 13 accordance with this Agreement and all applicable requirements.

  • Operating and Maintenance Expenses Subject to the provisions herein addressing the use of facilities by others, and except for operations and maintenance expenses associated with modifications made for providing interconnection or transmission service to a third party and such third party pays for such expenses, Developer shall be responsible for all reasonable expenses including overheads, associated with: (1) owning, operating, maintaining, repairing, and replacing Developer’s Attachment Facilities; and (2) operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities. The Connecting Transmission Owner shall be entitled to the recovery of incremental operating and maintenance expenses that it incurs associated with System Upgrade Facilities and System Deliverability Upgrades if and to the extent provided for under Attachment S to the ISO OATT.

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire 17.1.1 During the Operation Period, the Concessionaire shall operate and maintain the Bus Terminal in accordance with this Agreement either by itself, or through the O&M Contractor and if required, modify, repair or otherwise make improvements to the Bus Terminal to comply with the provisions of this Agreement, Applicable Laws and Applicable Permits, and conform to Specifications and Standards and Good Industry Practice. The obligations of the Concessionaire hereunder shall include: (a) permitting safe, smooth and uninterrupted flow of traffic on the Bus Terminal during normal operating conditions. Buses of other state road transport corporations shall be parked inside the Bus Terminal for which no charges shall be payable to the Concessionaire and if any charges are applicable for such parking then it shall be realized by Authority only; (b) minimising incidents affecting the safety and use of the Bus Terminal by providing a rapid and effective response and maintaining liaison with emergency services of the State; (c) carrying out periodic preventive maintenance of the Bus Terminal; (d) undertaking routine maintenance including prompt repairs of ticket counters, Workshops, Authority's Office and other infrastructure as mentioned in the Operation and Maintenance Schedule; (e) undertaking major maintenance such as per the Maintenance Schedule of the major infrastructure in the Bus Terminal; (f) preventing, with the assistance of the concerned law enforcement agencies, any encroachments on the Bus Terminal; (g) protection of the environment and provision of equipment and materials therefor; (h) operation and maintenance of all communication, control and administrative systems necessary for the efficient operation of the Bus Terminal; (i) maintaining a public relations unit to interface with and attend to suggestions from the Users, passengers, government agencies, media and other agencies; (j) complying with Safety Requirements in accordance with Article 18; (k) operation and maintenance of all Project Assets diligently and efficiently and in accordance with Good Industry Practice; (l) maintaining punctuality and reliability in operating the Bus Terminal; and (m) maintaining a high standard of cleanliness and hygiene in the Bus Terminal. 17.1.2 The Concessionaire shall remove promptly from the Bus Terminal all surplus construction machinery and materials, waste materials (including hazardous materials and waste water), rubbish and other debris (including, without limitation, accident debris) and keep the Bus Terminal in a clean, tidy and orderly condition,