SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.
Contract Database Metadata Elements Title: Sayville Union Free School District and Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU), Local 424 (2011) Employer Name: Sayville Union Free School District Union: Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU) Local: 424 Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 6131 Unit Size: 55 Number of Pages: 24 For additional research information and assistance, please visit the Research page of the Catherwood website - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/library/research/ For additional information on the ILR School - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/ 55 People TABLE OF CONTENTS ARTICLE Page XXII ANNUAL LEAVE DAYS 14 XXV BREAKS 18 XXVI CIVIL SERVICE LAW ARTICLE SECTION 75 18 XXVIII DURATION 19 XIV EMERGENCY WORK 11 XXI FOUL WEATHER CLOTHING 14 XI GRIEVANCE PROCEDURE 9 XVI HIGHER JOB CLASSIFICATION 12 XVIII HOLIDAYS 13 XV HOLIDAY AND WEEKEND BUILDING CHECKS 12 V INSURANCE 4 X LAYOFF, DISPLACEMENT AND RECALL ORDER 8 VII MANAGEMENT RIGHTS 7 XXVII MISCELLANEOUS 19 XVII NOTICES OF PROMOTIONS 13 XIII OVERTIME 10 II PAYROLL DEDUCTIONS 1 III PERSONNEL FILES 2 XXIV PHYSICAL EXAMINATIONS 18 XXIII RETIREMENT 16 IX STRIKES AND LOCKOUTS 7 XIX VACATIONS 13 XX VISITATION 14 IV WAGES 3 VI WORKERS' COMPENSATION 6 XII WORKWEEK 10 VIII WRITTEN BOARD POLICY 8 APPENDIX A 20 4/20/2016 AGREEMENT made and entered into this day of November 2013 between the SAYVILLE UNION FREE SCHOOL DISTRICT (hereinafter referred to as the “District”) and United Public Service Employees Union, ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, N.Y. 11779 (hereinafter referred to as the “Union”).
Research Use Reporting To assure adherence to NIH GDS Policy, the PI agrees to provide annual Progress Updates as part of the annual Project Renewal or Project Close-out processes, prior to the expiration of the one (1) year data access period. The PI who is seeking Renewal or Close-out of a project agree to complete the appropriate online forms and provide specific information such as how the data have been used, including publications or presentations that resulted from the use of the requested dataset(s), a summary of any plans for future research use (if the PI is seeking renewal), any violations of the terms of access described within this Agreement and the implemented remediation, and information on any downstream intellectual property generated from the data. The PI also may include general comments regarding suggestions for improving the data access process in general. Information provided in the progress updates helps NIH evaluate program activities and may be considered by the NIH GDS governance committees as part of NIH’s effort to provide ongoing stewardship of data sharing activities subject to the NIH GDS Policy.
MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.
Contractor Key Personnel The Contractor shall assign a Corporate OASIS SB Program Manager (COPM) and Corporate OASIS SB Contract Manager (COCM) as Contractor Key Personnel to represent the Contractor as primary points-of-contact to resolve issues, perform administrative duties, and other functions that may arise relating to OASIS SB and task orders solicited and awarded under OASIS SB. Additional Key Personnel requirements may be designated by the OCO at the task order level. There is no minimum qualification requirements established for Contractor Key Personnel. Additionally, Contractor Key Personnel do not have to be full-time positions; however, the Contractor Key Personnel are expected to be fully proficient in the performance of their duties. The Contractor shall ensure that the OASIS SB CO has current point-of-contact information for both the COPM and COCM. In the event of a change to Contractor Key Personnel, the Contractor shall notify the OASIS SB CO and provide all Point of Contact information for the new Key Personnel within 5 calendar days of the change. All costs associated with Contractor Key Personnel duties shall be handled in accordance with the Contractor’s standard accounting practices; however, no costs for Contractor Key Personnel may be billed to the OASIS Program Office. Failure of Contractor Key Personnel to effectively and efficiently perform their duties will be construed as conduct detrimental to contract performance and may result in activation of Dormant Status and/or Off-Ramping (See Sections H.16. and H.17.).