Opening and Preliminary Examination of Bids Clause Samples

The "Opening and Preliminary Examination of Bids" clause outlines the procedures for receiving, opening, and initially reviewing bids submitted in response to a solicitation. Typically, this clause specifies the time and place for bid opening, who may attend, and the process for recording bid details. It also describes the initial checks performed to ensure bids are complete and conform to basic submission requirements, such as proper documentation and signatures. The core function of this clause is to ensure transparency and fairness in the procurement process by establishing clear, standardized steps for handling and evaluating bids at the outset.
Opening and Preliminary Examination of Bids. 17.1. The BAC shall open the Bids in public at the time, on the date, and at the place specified in paragraph 9 of the IB. The Bidders’ representatives who are present shall sign a register evidencing their attendance. In case videoconferencing, webcasting or other similar technologies will be used, attendance of participants shall likewise be recorded by the BAC Secretariat. In case the Bids cannot be opened as scheduled due to justifiable reasons, the rescheduling requirements under Section 29 of the 2016 revised IRR of RA No. 9184 shall prevail. 17.2. The preliminary examination of bids shall be governed by Section 30 of the 2016 revised IRR of RA No. 9184.
Opening and Preliminary Examination of Bids. 24.1. The BAC shall open the bids in public, immediately after the deadline for the submission and receipt of bids, as specified in the BDS. In case the Bids cannot be opened as scheduled due to justifiable reasons, the BAC shall take custody of the Bids submitted and reschedule the opening of Bids on the next working day or at the soonest possible time through the issuance of a Notice of Postponement to be posted in the PhilGEPS website and the website of the Procuring Entity concerned. 24.2. Unless otherwise specified in the BDS, the BAC shall open the first bid envelopes and determine each Bidder’s compliance with the documents prescribed in ITB Clause 12, using a non-discretionary “pass/fail” criterion. If a Bidder submits the required document, it shall be rated “passed” for that particular requirement. In this regard, bids that fail to include any requirement or are incomplete or patently insufficient shall be considered as “failed”. Otherwise, the BAC shall rate the said first bid envelope as “passed”. 24.3. Unless otherwise specified in the BDS, immediately after determining compliance with the requirements in the first envelope, the BAC shall forthwith open the second bid envelope of each remaining eligible bidder whose first bid envelope was rated “passed”. The second envelope of each complying bidder shall be opened within the same day. In case one or more of the requirements in the second envelope of a particular bid is missing, incomplete or patently insufficient, and/or if the submitted total bid price exceeds the ABC unless otherwise provided in ITB Clause 13.2, the BAC shall rate the bid concerned as “failed”. Only bids that are determined to contain all the bid requirements for both components shall be rated “passed” and shall immediately be considered for evaluation and comparison. 24.4. Letters of Withdrawal shall be read out and recorded during bid opening, and the envelope containing the corresponding withdrawn bid shall be returned to the Bidder unopened. 24.5. All members of the BAC who are present during bid opening shall initial every page of the original copies of all bids received and opened. 24.6. In the case of an eligible foreign bidder as described in ITB Clause 5, the following Class “A” Documents may be substituted with the appropriate equivalent documents, if any, issued by the country of the foreign Bidder concerned, which shall likewise be uploaded and maintained in the PhilGEPS in accordance with Section 8.5.2 of the IR...
Opening and Preliminary Examination of Bids. 17.1. The BAC shall open the Bids in public at the time, on the date, and at the place specified in paragraph 9 of the IB. The Bidders’ representatives who are present shall sign a register evidencing their attendance. In case videoconferencing, webcasting or other similar technologies will be used, attendance of participants shall likewise be recorded by the BAC Secretariat. In case the Bids cannot be opened as scheduled due to justifiable reasons, the rescheduling requirements under Section 29 of the 2016 revised IRR of RA No. 9184 shall prevail. 17.2. The preliminary examination of bids shall be governed by Section 30 of the 2016 revised IRR of RA No. 9184. 2 In the case of Framework Agreement, the undertaking shall refer to entering into contract with the Procuring Entity and furnishing of the performance security or the performance securing declaration within ten (10) calendar days from receipt of Notice to Execute Framework Agreement.
Opening and Preliminary Examination of Bids. 14.1 The BAC shall open the Bids in the presence of the bidders’ representatives who choose to join the zoom meeting, on the date, and at the place specified in paragraph 9 of the IB. The Bidders’ representatives who are present shall sign a register 1 In the case of Framework Agreement, the undertaking shall refer to entering into contract with the Procuring Entity and furnishing of the performance security or the performance securing declaration within ten (10) calendar days from receipt of Notice to Execute Framework Agreement. evidencing their attendance. In case videoconferencing, webcasting or other similar technologies will be used, attendance of participants shall likewise be recorded by the BAC Secretariat. In case the Bids cannot be opened as scheduled due to justifiable reasons, the rescheduling requirements under Section 29 of the 2016 revised IRR of RA No. 9184 shall prevail. 14.2 The preliminary examination of bids shall be governed by Section 30 of the 2016 revised IRR of RA No. 9184.
Opening and Preliminary Examination of Bids. The BAC shall open the bids in public, immediately after the deadline for the submission and receipt of bids, as specified in the BDS. In case the Bids cannot be opened as scheduled due to justifiable reasons, the BAC shall take custody of the Bids submitted and reschedule the opening of Bids on the next working day or at the soonest possible time through the issuance of a Notice of Postponement to be posted in the PhilGEPS website and the website of the Procuring Entity concerned. For electronic bid submission, the password for accessing the Bidding Documents will be disclosed by the Bidders only during the actual bid opening which may be done in person or face-to-face through videoconferencing, webcasting or similar technology.
Opening and Preliminary Examination of Bids. 17.1. The Bidder shall open the Bids in public at the time, on the date, and at the place specified in paragraph 9 of the IB. The Bidders’ representatives who are present shall sign a register evidencing their attendance. In case videoconferencing, webcasting or other similar technologies will be used, attendance of participants shall likewise be recorded by the BAC Secretariat. In case the Bids cannot be opened as scheduled due to justifiable reasons, the rescheduling requirements under Section 29 of the 2016 revised IRR of RA No. 9184 shall prevail.

Related to Opening and Preliminary Examination of Bids

  • Preliminary Examination 24.1 The Purchaser will examine the bids to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the bids are generally in order. 24.2 Arithmetical errors will be rectified on the following basis. If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the total price shall be corrected. If the Supplier does not accept the correction of the errors, its bid will be rejected, and its bid security may be forfeited. If there is a discrepancy between words and figures, the amount in words will prevail. 24.3 The Purchaser may waive any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder. 24.4 Prior to the detailed evaluation, pursuant to ITB Clause 25 the Purchaser will determine the substantial responsiveness of each bid to the bidding documents. For purposes of these Clauses, a substantially responsive bid is one which conforms to all the terms and conditions of the bidding documents without material deviations. Deviations from, or objections or reservations to critical provisions, such as those concerning Bid Security (ITB Clause 15), Applicable Law (GCC Clause 30), and Taxes and Duties (GCC Clause 32), will be deemed to be a material deviation. The Purchaser’s determination of a bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence.

  • Inspection Checklist (Check one)

  • OIG INSPECTION, AUDIT, AND REVIEW RIGHTS ‌ In addition to any other rights OIG may have by statute, regulation, or contract, OIG or its duly authorized representative(s) may conduct interviews, examine or request copies of ▇▇▇▇▇▇’▇ books, records, and other documents and supporting materials and/or conduct on-site reviews of any of ▇▇▇▇▇▇’▇ locations for the purpose of verifying and evaluating: (a) ▇▇▇▇▇▇’▇ compliance with the terms of this IA and (b) ▇▇▇▇▇▇’▇ compliance with the requirements of the Federal health care programs. The documentation described above shall be made available by ▇▇▇▇▇▇ to OIG or its duly authorized representative(s) at all reasonable times for inspection, audit, and/or reproduction. Furthermore, for purposes of this provision, OIG or its duly authorized representative(s) may interview ▇▇▇▇▇▇ and any of ▇▇▇▇▇▇’▇ employees or contractors who consent to be interviewed at the individual’s place of business during normal business hours or at such other place and time as may be mutually agreed upon between the individual and OIG. ▇▇▇▇▇▇ shall assist OIG or its duly authorized representative(s) in contacting and arranging interviews with such individuals upon OIG’s request. ▇▇▇▇▇▇’▇ employees and contractors may elect to be interviewed with or without a representative of ▇▇▇▇▇▇ present.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.