Option Work. Option Work includes the addition of the Broadway Boulevard from Harbor Drive to I-37. The scope of Option Work includes the design and construction of a four-lane divided boulevard section as shown in Attachment 1-2. This work includes all applicable pavement, drainage, curb & gutter, sidewalks, ADA ramps, grading, lighting, signals, striping and signage; which shall be designed to Section 7 and Section 8 of the Technical Provisions and the City of Corpus Christi Drainage Design Manual. Developer will be responsible for all coordination with applicable Government Entities, major stakeholders and adjacent land owners, as required for this Option Work. In the event that the Option Work is not instructed by TxDOT, as part of the Base Scope, Developer shall restore connectivity to the local streets along the existing US 181 alignment between I-37 and Harbor Drive. This shall include connecting Belden Street, ▇▇▇▇▇▇ Street, ▇▇▇▇▇▇▇▇ Street, and Power Street across the I-37 ROW. Harbor Drive, Palo Alto Street, ▇▇▇▇▇▇▇▇▇▇ Street, Resaca Street, and ▇▇▇▇▇▇ Street shall be connected to North Broadway Street. 1.3.1.1 [Option 2 Work
Appears in 2 contracts
Sources: Comprehensive Development Agreement, Comprehensive Development Agreement