Outages for Installation of Interconnection Facilities Clause Samples

Outages for Installation of Interconnection Facilities. In the event that installation of the New Interconnection Facilities to be constructed under this agreement will require an outage of the Generating Facility, the Distribution Provider shall provide written notice to the Interconnection Customer at least sixty days before the planned outage, unless the Interconnection Customer waives this requirement in writing. The date and time any such planned outage shall occur shall be agreed to in writing by both the Distribution Provider and the Interconnection Customer.

Related to Outages for Installation of Interconnection Facilities

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the ▇▇▇▇▇ Solar Collector Substation.

  • Use of Interconnection Facilities by Third Parties 494950 9.9.1 Purpose of Interconnection Facilities 494950 9.9.2 Third Party Users. 50 9.10 Disturbance Analysis Data Exchange. 50 ARTICLE 10. MAINTENANCE 50 10.1 Participating TO Obligations. 50 10.2 Interconnection Customer Obligations. 50 10.3 Coordination 505051