Outfall Systems Clause Samples

The Outfall Systems clause defines the requirements and standards for the design, construction, and maintenance of systems that discharge water or effluent from a site into the environment or public infrastructure. Typically, this clause specifies the types of materials to be used, the capacity and location of outfall points, and any necessary permits or environmental protections that must be observed. By establishing clear guidelines for outfall systems, the clause ensures compliance with environmental regulations and helps prevent pollution or flooding, thereby protecting both the project and the surrounding community.
Outfall Systems a. In-kind repair, replacement, or minor upgrades to outfall pipes along beaches or inland waterways. The following criteria for determining whether a building or structure is collapsed will be applied by FEMA to support identification of buildings and structures eligible for the following programs: Public Assistance Private Property Debris Removal (PPDR); Individual Assistance Permanent Housing Construction-Repair (PHC-R) subject to Section 106 review as per Stipulation I.7.a. of this Agreement; Public Assistance and Hazard Mitigation projects. Any structure/building that meets one or more of the identified criteria below is considered to lack integrity and will not be considered eligible for listing in the National Register of Historic Places: A. The structure is collapsed forming a pile of debris and rubble, or rubble has already been removed from property (unable to identify as a structure/building). B. The structure has been displaced from its original block/lot parcel. C. The structure is certified as an imminent threat, structurally unstable and unsafe for human habitation by building codeofficials in the municipality (decreed by municipal ordinance). D. The structure demonstrates the following characteristics listed below (porches should not be considered): 1. Minimally wracked or canted. Wracked or canted is defined as “moved by forces in multiple dimensions which have distorted what was a rectangular shape into a parallelogram; twisted, not merely shifted or tilted”. 2. Missing two or more full elevations of a single floor and/or missing additional stories (second or third floors). The following process for Private Property Debris Removal (PPDR) will be followed by FEMA to ensure that only buildings and structures meeting FEMA’s Public Assistance and Hazard Mitigation Programs (FEMA Programs) eligibility requirements will be reviewed for compliance with Section 106. A. Local building authorities will be responsible for submitting properties to the Puerto Rico Central Office for Recovery, Reconstruction and Resiliency (COR3), and then to FEMA Programs for inclusion in the PPDR program. B. FEMA Programs staff shall submit five photographs of each property, including one of each elevation and one of the streetscape. C. Accurate GPS coordinates will be submitted for each property. D. FEMA Programs will review each application (including photos) to ensure that each property meets program eligibility. E. Only properties that the FEMA Programs has revie...
Outfall Systems. 13 a. In-kind repair, replacement, or minor upgrades to outfall pipes along beaches 14 or inland waterways. 1 Appendix C‌‌‌
Outfall Systems a. In-kind repair, replacement, or minor upgrades to outfall pipes along beaches or inland waterways. When avoidance or minimization of adverse effects is not appropriate, the following Treatment Measures are suggested for the resolution of adverse effects for historic properties: If Undertakings may or will result in adverse effects, NCORR, SHPO, the Recipient/Subrecipient, consulting Tribe(s), and ACHP (Council), if participating, may develop a mitigation plan that includes one or more of the following Treatment Measures, depending on the nature of historic properties affected and the severity of adverse effects. This Appendix may be amended in accordance with Stipulation VIII. A of this Agreement, Amendments.
Outfall Systems. In-kind repairor minor upgrades to outfall pipes along beaches or inland waterways. 1849 1850 1851 1852 1853 1854 1855 1856 1857 1858 1859 1860 1861 1862 1863 1864 1865 1866 1867 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891

Related to Outfall Systems

  • Infrastructure Modification of the location and/or sizing of the infrastructure for the Project that does not materially change the functionality of the infrastructure.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Systems The Servicer covenants that at the date hereof in respect of the software which is used by the Servicer in providing the Services, it shall for the duration of this Agreement: