PRODUCTIVITY The Union shall place no limitations upon the amount of work which an Employee shall perform during the working day and there shall be no restrictions imposed against the use of any type of machinery, tools or labour saving devices.
Productivity Allowance A productivity allowance per hour worked will be paid to employees engaged upon construction work from the date of agreement. This allowance will not be subject to penalty addition and shall be in lieu of all or any Parent Award disability allowances, with the exception of the multi-storey allowance. Site/Project Allowances will be paid in addition to the productivity allowance where such an addition is either: (i) Where such an allowances is awarded by the Industrial Relations Commission; or (ii) Where such an allowance is required by a site condition specified at the time of tender. It is incumbent upon the company to enquire of the Head Contractor/Client at the time of tender whether a site/project allowance is required to be paid and in particular whether it is required to be paid in accordance with the Construction Industry Site Allowance Matrix: or (iii) If the Contract between the Employer and the Head Contractor/Client does not contain provision for a site allowance, and after the contract is made the head contractor makes an agreement under which a site allowance is payable, then the head contractor should then agree in writing to reimburse the employer the full cost of the said allowance.
Metrics Institutional Metrics System-Wide Metrics
Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the ▇▇▇▇▇ Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/▇▇▇▇▇▇▇ KXM-550, GE Grid Solutions KOTEF ▇▇▇.▇▇, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556
Customer Satisfaction 4.1. Goods and/or Services to be provided under Call Off Contract to the satisfaction of Customers 20% Confirmation by the Authority of the Supplier’s performance against customer satisfaction surveys