Pavement Sample Clauses

POPULAR SAMPLE Copied 1 times
Pavement. Delete paragraph 7 and insert the following paragraphs 7A to 7F:
Pavement. The combined surface course, base course, and subbase course, if any, considered as a single unit.
Pavement. Carriageways should be paved with cement concrete or asphalt concrete. However, Class III may be paved with double bituminous treatment. The pavement of many road sections in the Asian Highway member countries is damaged owing to insufficient load capacity. The design load for pavements should therefore be determined carefully to prevent damage to the road surface and consequently to reduce maintenance costs. However, road pavements should be designed taking into account: (a) Axle load; (b) Traffic volume; (c) Quality of materials to be used for basecourse and subgrade (as the quality of road construction materials varies from country to country, the pavement load specification was not included in the Asian Highway standards).
Pavement. The existing asphalt pavement shall be excavated to full depth off the existing road and bridge. The RAP (reclaimed asphalt pavement) shall be transported and stockpiled by the Contractor at the Department’s Charlottetown Storage Yard. The unit bid price for the above listed shall be full compensation for the work. No additional compensation shall be provided. Note that the Contractor shall confirm with the Department, prior to starting any asphalt excavation activities, the extent of excavation required.
Pavement. One or more layers of specified material of designed thickness at the top of the pavement structure.
Pavement. The City warrants that the City’s pavement, curbing or other driving surface or any right of way reasonably necessary for the Service Provider to provide the Services described herein are sufficient to bear the weight of all of the Service Provider’s equipment and vehicles reasonably required to perform such Services. The Service Provider will not be responsible for damage to any such pavement, curbing, driving surface or right of way, except to the extent resulting from the Service Provider’s negligence or willful misconduct.
Pavement. Identify length and location of pavement to be demolished. 3.
Pavement. I57A - S00(05901) ITEM 2590- (ITEM 0590- ) - ACCELERATED CONCRETE PAVEMENT PATCHING 29 . G25668A - TEST - Carriage Returns in Before and After Para ........................................................................... 30
Pavement. Structures, including bridges, retaining walls, and major culverts, and building alterations (limited to establishing basic concepts, accommodating clearances and stream flow, and estimating costs). Bridge investigative work (inspection, deck coring, etc.) is covered under Section 2. • Drainage. • Maintenance responsibility. • Maintenance and protection of traffic during construction. • Soil and foundation considerations. • Utilities. • Railroads. • Right-of-way acquisition requirements. • Conceptual landscaping (performed by a Registered Landscape Architect). • Accessibility for pedestrians, bicyclists and the disabled. • Lighting.
Pavement. The combination of sub-base, base course, and surfacing materials placed on a subgrade to support the traffic load and distribute it to the subgrade. PEDESTRIAN - Person traveling on foot or in a wheelchair or similar device. PEDESTRIAN FACILITIES - Infrastructure and equipment to accommodate or encourage walking, including sidewalks, curb ramps, traffic control devices, trails, walkways, crosswalks, paved shoulders, and other design features intended to provide for pedestrian travel. PERFORMANCE GUARANTEE - A financial guarantee in a form acceptable to the City Attorney to ensure all improvements, facilities, or work required by this ordinance will be completed in compliance with this ordinance, regulations, and approved plans and specifications. PERMIT - A document or franchise authorized by the City. PERVIOUS MATERIALS - Materials which permit water to enter the ground by virtue of their pervious nature or by large spaces in the material. PERVIOUS PAVING - This term describes a system comprised of a load-bearing, durable surface together with an underlying layer that temporarily stores water prior to infiltration or drainage to a controlled outlet. PLAN REVIEWER - The engineering plan reviewer of the City of Olympia Community Planning and Development Department.