PHASE V – CONSTRUCTION ADMINISTRATION Clause Samples

The "PHASE V – CONSTRUCTION ADMINISTRATION" clause defines the responsibilities and procedures that apply during the construction phase of a project. Typically, this clause outlines the architect's or project manager's role in overseeing construction activities, reviewing contractor submissions, conducting site visits, and ensuring that the work complies with the contract documents. It may also specify how changes, issues, or disputes during construction are to be managed. The core function of this clause is to establish clear oversight and communication protocols during construction, thereby helping to ensure the project is completed according to agreed standards and timelines.
PHASE V – CONSTRUCTION ADMINISTRATION. 2.5.1 The Architect’s responsibility to provide Basic Services for Construction Administration under this Agreement commences with the awarding of any agreement for construction and terminates at the latter of the issuance to the Owner of the final Certificate for Payment to GC; issuance of a Certificate of Occupancy; or submission of record drawings unless extended by means authorized by the Owner. 2.5.2 The Architect shall provide Construction Administration services and/or work as set forth in the current edition of the AIA Document A201, General Conditions of the Contract for Construction, as of the date of this Agreement. 2.5.2.1 Said services and/or work may be modified only by written amendment, agreed to, and fully executed by the Owner and Architect. 2.5.2.2 If there are any conflict(s) between the terms and conditions of this Agreement and the current edition of the AIA Document A201, General Conditions of the Contract for Construction, as of the date of this Agreement, the terms and conditions of this Agreement shall govern and control. 2.5.3 The duties, responsibilities, and limitations of the authority of the Architect during Construction Administration shall not be restricted, modified, and/or extended without a written amendment, agreed to, and fully executed by the Owner and Architect and notice provided to the GC. 2.5.4 The Architect shall be a representative of the Owner and shall advise and consult with the Owner. Instructions to the GC shall be forwarded through the Architect. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement, unless otherwise modified by written amendment, agreed to, and fully executed by the Owner and Architect. 2.5.5 The Architect shall visit, observe, and inspect the Project site, as required, while construction work is in progress, as often as necessary, and appropriate to the stage of construction (with emphasis on structural work). The Architect shall become familiar with the progress and quality of the work and to determine, for the Owner’s benefit and protection, that the work is proceeding in accordance with the intent of the
PHASE V – CONSTRUCTION ADMINISTRATION. Project Observation and Inspection: Upon acceptance of Phase IV by the County, the A/E shall perform the following work:
PHASE V – CONSTRUCTION ADMINISTRATION. THE CONSULTANT shall conduct bi-weekly and as needed field visits. In addition to the architect visits, the civil engineer, landscape architect, security consultant, hardware consultant, electrical engineer, communications consultant, structural engineer, and mechanical engineer will make periodic visits appropriate to their discipline. THE CONSULTANT shall prepare a field report for each visit. The number of visits is based on twice monthly visits for the duration of the construction schedule including the period between substantial completion and final completion.
PHASE V – CONSTRUCTION ADMINISTRATION. A. Upon successful completion of the Bidding Phase, ENGINEER will perform the following: 1. General Administration of Construction Contract. Consult with OWNER and act as OWNER’s representative as provided in the General Conditions. All of OWNER’s instructions to Contractor will be issued through ENGINEER, who shall have authority to act on behalf of OWNER in performance of Construction Administration of the Construction Contract to the extent provided in this Agreement and said General Conditions. 2. ENGINEER shall distribute plans and specifications to the selected reproduction company. The reproduction and shipping costs for these documents shall be paid for by the prospective bidders or by OWNER (at OWNER's discretion) 3. Selecting Independent Testing Laboratory. Assist OWNER in the selection of an independent testing laboratory to perform the services needed for the PROJECT.
PHASE V – CONSTRUCTION ADMINISTRATION. Bidding: Either one or two certified New Avenue contractors will provide fixed price construction bids to construct the Building. One New Avenue contractor and one Client introduced contractor is the standard. Client may introduce as many contractors as desired. Client shall review bids received and New Avenue shall assist Client in selecting a contractor. Client may choose any bid provided, including a bid from a General Contractor that is outside of New Avenue’s network of Contractors. New Avenue’s relationship with certain contractors in no way obligates Client to select a New Avenue contractor to construct the Building. A final budget, based upon the final construction documents, will be submitted for Client approval on the Project Page at this time.

Related to PHASE V – CONSTRUCTION ADMINISTRATION

  • Construction Administration Redeveloper shall be responsible for all components of the Redeveloper Improvements constructed by Redeveloper including construction management, coordination of contractors and regulatory permitting and other requirements. Redeveloper and its contractor(s) shall reasonably cooperate with City contractors performing work in the vicinity of the Redevelopment Project Area including, but not limited to, Redeveloper's scheduling of its work to provide for a smooth sequence of operations. The Redeveloper will be solely responsible for payment of all construction costs for the Redeveloper Improvements as set forth in this Redevelopment Agreement.

  • Construction Phase - Administration of the Construction Contract INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.9.1. The Construction Phase will commence with the award of the Construction Contract to a selected vendor (“Contractor”) and will terminate when final payment is made by the State to the Contractor. In any event, the construction phase will not extend 60 days beyond the substantial completion date unless extended by change order. If such extension occurs, additional costs due to the ARCHITECT/ENGINEER shall be negotiated with the State. 1.1.9.2. The ARCHITECT/ENGINEER shall work with the State during the construction of the Project to provide the administration of the contract between the State and the Contractor in accordance with the terms herein and consistent with the contract between the State and the Contractor, and the extent of his/her duties and responsibilities and the limitations of his/her authority as assigned therein shall not be modified without his/her written consent. 1.1.9.3. The ARCHITECT/ENGINEER shall advise and consult with the State, and all of the State's instructions to the Contractor shall be issued through the ARCHITECT/ENGINEER after authorization by the State. 1.1.9.4. The ARCHITECT/ENGINEER shall, at all times, have access to the work wherever it is in preparation or progress. 1.1.9.5. The ARCHITECT/ENGINEER shall make periodic visits to the Project site, at least biweekly, and shall make such further visits when reasonably requested by the State, as to familiarize himself/herself with the progress and quality of the work performed and as to determine, on the basis of such visits, if such progress and quality are in accordance with the Contract Documents. The ARCHITECT/ENGINEER shall be responsible for project meeting minutes. In addition to this, the ARCHITECT/ENGINEER shall periodically report his/her findings thereon to the State, at such times as in the exercise of his/her professional judgment such findings are appropriate and at least monthly, at the conference provided for in Section 1.1.9.6, and further at such times as the State may reasonably request. The ARCHITECT/ENGINEER shall not be required to make exhaustive or continuous on-site inspections, except as required in the exercise of his/her professional judgment for said reports and, except in particular, to fulfill the commissioning requirements. The ARCHITECT/ENGINEER shall not be responsible for construction means, methods, techniques, sequences or procedures or for safety precautions and programs in connection with the work, and he/she shall not be responsible for the Contractor's failure to carry out the work in accordance with the Contract Documents except as provided for herein specifically between the State and the ARCHITECT/ENGINEER. 1.1.9.6. In preparing the bid documents, to the extent that the ARCHITECT/ENGINEER utilizes sub- consultants for their expertise, such as, but not limited to: Landscape Architects, Civil, Structural, Mechanical, and Electrical Engineers, these consultants, in effect, become an extension of the ARCHITECT/ENGINEER. Where the term ARCHITECT/ENGINEER is used in Section 1.1.9.2 as well as 1.1.9.5, it shall include those sub-consultants when work is being performed in their area of expertise. For example, the Mechanical Engineer would inspect the under slab plumbing before it is backfilled, but then wouldn’t necessarily be needed on site until the rest of the mechanical systems are being installed. The sub-consultant shall also be required to periodically inspect the progress of the “As-builts” and verify that they are up-to-date and verify such to the ARCHITECT/ENGINEER, before the ARCHITECT/ENGINEER issues the certificate of payment for that pay period. 1.1.9.7. Based upon his/her determinations and reports made under Section 1.1.9.5 of this Agreement and upon the Contractor's applications for payment, the ARCHITECT/ENGINEER shall once every month, after an on-site conference between the State, the Contractor and the ARCHITECT/ENGINEER, determine the amount then owing to the Contractor and shall then issue a certificate of payment for the amount agreed upon. The issuance of a Certificate for Payment shall constitute a representation by the ARCHITECT/ENGINEER to the State, based on such ARCHITECT/ENGINEER'S determination and report and the data supplied to him/her by the Contractor (without affecting his/her duties defined in Section 1.1.9.5.), that the work has progressed to the point indicated; that the quality of the work is in accordance with the Contract Documents (subject to the results of any specified subsequent tests required by the Contract Documents, to immaterial and insubstantial deviations from the Contract Documents, which will be corrected prior to completion, and to any further specific qualifications stated in the Certificate for Payment); and that the Contractor is entitled to such payment in the amount certified. Provided, however, the issuance of such certificate will not affect any obligations of the Contractor to the State. By issuing a certificate for payment, the ARCHITECT/ENGINEER shall not be deemed to represent that he/she has made any examination to ascertain how and for what purpose the Contractor has used the monies paid on account of the contract sum. ARCHITECT/ENGINEER shall not accept any part of the work on behalf of the State; ARCHITECT/ENGINEER may only recommend acceptance. Final acceptance is a right reserved solely to the State. 1.1.9.8. The ARCHITECT/ENGINEER shall be, in the first instance, the interpreter of the requirements of all Construction Documents, and shall have all requisite authority relating thereto for the purposes of authorizing the Contractor to proceed or stop with any component of the project after consultation and agreement with the State. The ARCHITECT/ENGINEER shall not be liable to the State for any loss or cost incurred by the State arising from delays in the construction schedule caused by any decision made by the ARCHITECT/ENGINEER in the reasonable exercise of professional judgment either to exercise or not to exercise his/her authority to stop the Work. 1.1.9.9. The ARCHITECT/ENGINEER shall review and respond to shop drawings, samples, and other submissions of the Contractor as in conformance with the design concept and information in the Contract Documents and the designs and plans relating to the project until approved or not requiring re-submission. The ARCHITECT/ENGINEER shall also review the submittal log at construction meetings and report to the State, on a monthly basis, their findings thereon. 1.1.9.10. The ARCHITECT/ENGINEER shall prepare all change orders and supporting data for the State's approval. 1.1.9.11. The ARCHITECT/ENGINEER shall conduct inspections to determine the Dates of Substantial Completion and Final Completion and shall receive written guarantees and related documents assembled by the Contractors and shall issue a final certificate of payment in accordance with Section 1.1.9.6. 1.1.9.12. The ARCHITECT/ENGINEER shall be responsible for system commissioning in accordance with the BGS Design Guidelines and as indicated in the BGS Commissioning Guidelines. Please see the BGS website ▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇.▇▇▇/facilities/forms . The ARCHITECT/ENGINEER shall inspect, and document, each and every system to ensure that it complies with design intent, including but not limited to: system installation, system operation, and seasonal changeover. 1.1.9.13. Except in the manner specifically provided for herein, the ARCHITECT/ENGINEER shall not be responsible to the State for the acts or omissions of the Contractor or any of the Contractor’s agents or employees, or any other person not an employee or agent of the ARCHITECT/ENGINEER performing work on the Project. The ARCHITECT/ENGINEER shall be responsible for and shall pay the amount of any increase in the total Contract Price or the total Change Order(s) Price, which increase results from an error, inconsistency, or omission in the Contract Documents or instructions. 1.1.9.14. ARCHITECT/ENGINEER shall furnish to the State, a complete set of marked-up drawings and specifications showing all the changes to the Construction Documents made by Addenda, Change Orders, Shop Drawings, RFIs and other information received from the Clerk; and General Contractor’s As-built markups. The changes to the drawings are to be created on a separate layer in the DWG set and highlighted in a box, cloud or the like in the PDF set. The specifications are also to differentiate the changes made by highlighting in a box, cloud, etc. and be provided in Microsoft Word. These drawings and specifications shall be supplied within three (3) months of the date of Substantial Completion and before final payment. 1.1.9.15. Architect/Engineer (and design team members as required) shall conduct a one-year warranty inspection of the completed construction project between the eleventh and twelfth month from the date of substantial completion and shall issue a list of defective items needing correction to the Contractor.

  • Construction Administration Phase Delete the following paragraph if Submittal Exchange isn’t going to be used: 2.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State. 4.3.2 The Contractor shall be responsible to the State for the acts and omissions of his / her employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with the Contractor. 4.3.3 The Contractor shall not be relieved from his / her obligations to perform the Work in accordance with the Contract Documents either by the activities or duties of the Architect in his / her administration of the Contract, or by inspections, tests or approvals required or performed under Paragraph 7.7 by persons other than the Contractor. 4.3.4 The Contractor shall acquaint himself (herself / itself) with the limits of the property or right- of-way of the State and shall not trespass on other property. The Contractor shall adequately protect the project, adjacent property and the public, and shall be responsible for any damage or injury due to the Contractor’s act or neglect, and shall save the State harmless in respect thereto. 4.3.5 All work shall be done in such a manner as not to interfere with the State’s operating functions. Contractor and his employees shall familiarize themselves and comply with all rules and regulations applicable to the project. 4.3.6 The Contractor shall keep the premises free from liens arising out of or from the Project. Contractor shall obtain and submit waivers of liens with a request for a progress or final payment.