Planned methods of analysis Sample Clauses

The "Planned methods of analysis" clause defines the specific statistical or analytical techniques that will be used to evaluate data collected during a study or project. This clause typically outlines which variables will be analyzed, the statistical tests or models to be applied, and any criteria for interpreting results. By clearly specifying these methods in advance, the clause ensures transparency, reduces the risk of bias, and provides a roadmap for consistent and reproducible data analysis.
Planned methods of analysis. All data recorded will be presented in data listings and summary tables, as appropriate. Missing values will not be replaced. No formal hypothesis testing will be performed.
Planned methods of analysis. The primary analysis will be performed after 60 KTE-X19 subjects in Cohort 1 have been treated and have had the opportunity to be evaluated for response 6 months after the Week 4 disease assessment. In this primary analysis, inferential testing of efficacy will be performed with data from Cohort 1 KTE-X19 subjects only, and the analysis with the data from Cohort 1 axicabtagene ciloleucel subjects and Cohort 2 will be descriptive. Additional analyses may occur after the primary analysis has been completed. These additional analyses will be descriptive and will occur after inferential testing in Cohort 1 has been performed. The final analysis will occur when all subjects in both cohorts have completed the study. The primary endpoint of ▇▇▇ will be based on IRRC review of disease assessments in the mITT set. Analyses of ▇▇▇ based on investigator review of disease assessments will also be performed.

Related to Planned methods of analysis

  • Other Methods of Procurement of Goods and Works The following table specifies the methods of procurement, other than International Competitive Bidding, which may be used for goods and works. The Procurement Plan shall specify the circumstances under which such methods may be used: (a) National Competitive Bidding (b) Shopping (c) Direct Contracting

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.