Discretion in relation to card/facilities Notwithstanding and without prejudice to the other provisions of this agreement, we are entitled to, at any time in our reasonable discretion with reasonable notice and without giving any reason:- (a) increase or decrease the combined credit limit; and/or (b) refuse to re-issue, renew or replace the card; and/or (c) introduce, amend, vary, terminate or withdraw all or any of the benefits, services, facilities and privileges in respect of or in connection with your card account and your being a cardmember (e.g. preferential interest rate balance transfer programs, instalment plans, exclusive invitations to events, access to health, travel, credit balance repayment insurance offered in collaboration with key insurance companies) whether specifically relating to you or generally to all cardmembers. Updated information on the benefits, services, facilities and privileges will be provided by us via such means as we deem appropriate including via our online portal ▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇.▇▇.
Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades
Promotion to a Higher Classification An employee who is promoted to a higher rated classification within the bargaining unit will be placed in the range of the higher rated classification so that he shall receive no less an increase in wage rate than the equivalent of one step in the wage rate of his previous classification (provided that he does not exceed the wage rate of the classification to which he has been promoted).
Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.