Common use of Post-Occupancy Clause in Contracts

Post-Occupancy. 8.5.1 During the Correction Period, the A/E shall work with the Contracting Authority, Owner, CM, and Contractor to investigate suspected Defective Work and to design and coordinate its repair or completion. The Owner shall not be obligated to compensate the A/E for the A/E’s performance of the A/E’s services under this Section 8.5.1 unless it has been determined that the Defective Work was not the result of the A/E’s failure to meet its obligations under the Agreement. Version Control Document 8.5.2 The A/E shall participate in a walk-through of the Project with the Owner and the CM one month prior to the expiration of each Correction Period. The A/E shall consult with the CM and the Owner to address any issue identified in the walk-through according to the procedures specified in the General Conditions. The A/E shall notify the Contractor of such defects in writing with a request that the Contractor correct the Defective Work, prior to the end of the Correction Period.

Appears in 1 contract

Sources: Professional Services

Post-Occupancy. 8.5.1 9.5.1 During the Correction Period, the A/E shall work with the Contracting Authority, Owner, CMCxA, and Contractor to investigate suspected Defective Work and to design and coordinate its repair or completion. The Owner shall not be obligated to compensate the A/E for the A/E’s performance of the A/E’s services under this Section 8.5.1 9.5.1 unless it has been determined that the Defective Work was not the result of the A/E’s failure to meet its obligations under the Agreement. Version Control Document. 8.5.2 9.5.2 The A/E shall participate in a walk-through of the Project with the Owner and the CM one month prior to the expiration CxA 10 ten months after each date of each Correction PeriodSubstantial Completion. The A/E shall consult with the CM and the Owner to address any issue identified in the walk-through according to the procedures specified in the General Conditions. The A/E shall notify the Contractor of such defects in writing with a request that the Contractor correct the Defective Work, prior to the end of the Correction Period.

Appears in 1 contract

Sources: Professional Services